information
COVID-19 Safety, Recovery and Resilience

Face coverings are required in indoor public spaces and many outdoor spaces. State policy
Access City programs, people and projects helping Portland recover. Portland United

Volunteer. Play. Stay. Shop. Show the Rose City a little love. Here for Portland

Construction

23 projects found
Fall 2021
In March 2019, Portland Parks & Recreation received a safety and structural stability assessment of Montavilla Park’s picnic shelter. The report indicates that the structure is presumed to be unsafe and must be removed to ensure visitor safety.

Central Eastside Access and Circulation project

Transportation
Engineering And Design
2020-2023
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding and modifying traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.

NE 97th Avenue Phase II and NE Couch / Davis LIDs

Transportation
Engineering And Design
Construction expected Summer 2022
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements, with possible additional utility undergrounding improvements to NE 97th Avenue from E Burnside Street to NE Davis Street, and E Burnside Street from 9400 block to NE 97th Avenue.
Project design is complete. Construction is now anticipated to begin in fall or winter--as soon as October..
Environmental Services will be constructing a project that will install and upsize public sewer pipes, as well as construct green street planters within the Buckman and Kerns neighborhoods. These improvements will increase sewer capacity, relieve sewer backups, and reduce street flooding.