Construction
Interstate Firehouse Cultural Center Feasibility Study
Parks
In Planning
Study completion expected Summer 2024
A feasibility study is underway which will produce market, financial, and operational analyses to determine a sustainable operating plan for IFCC – a plan that is in alignment with the community’s vision.
NE MLK Jr Blvd - Corridor Safety Investment Strategy
Transportation
In Planning
2024 - 2025
The NE Martin Luther King Jr Boulevard project will enhance pedestrian crossings and reduce gaps between crossings to improve safety, access transit, and access to destinations along MLK.
North Portland Aquatic Center Project
Parks
In Planning
Anticipated project duration: 5-7 years / Duración prevista del proyecto: 5-7 años
Portland Parks & Recreation (PP&R) is building a new indoor aquatic center to North Portland.
Dr. Darrell Millner Building
Rental
Under Construction
Winter 2024
Community Development Partners and Self-Enhancement, Inc. are building 63 units of affordable family housing in Overlook with priority to displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.
N Delaware Neighborhood Greenway: N Sumner St to N Terry streets
Transportation
Engineering And Design
Construction planned for Spring 2024
The Portland Bureau of Transportation (PBOT) will create the N Delaware Greenway to establish low-stress neighborhood streets that are great places to walk, bike, roll, and play.
N Going and Greeley Sewer Project
Sewer and Stormwater
Active
This project is currently in design and construction is not anticipated to begin until the summer of 2024.
Environmental Services is designing a project to install and replace public sewer pipes along N Going Avenue, N Going Court, N Humboldt Street, and N Greeley Street. Replacing and repairing the aging and damaged sewer pipes will help protect public health and the environment.
North River Sewer Repair Project
Sewer and Stormwater
Active
Construction is expected to start September 2024 and take about 6 months to complete.
Environmental Services is designing a project to replace deteriorating sewer pipe under North River Street between Albina and Interstate avenues. Taking these actions now reduce the possibility of costly breaks, leaks, blockages and sewage releases to buildings, streets, streams, and rivers.
Tistilal Village
Rental
Under Construction
Summer 2024
Tistilal Village, owned by NAYA Family Center, will be redeveloped as 57 units of affordable housing with culturally specific services for Native American families in Portsmouth.
North Bradford Sewer Project
Sewer and Stormwater
Active
Construction is expected to begin in September 2024 and take about 6 months to complete.
Environmental Services is designing a project to abandon a deteriorated sewer pipe under North Bradford Street between Burlington and Richmond Avenues and reroute all private connections to adjacent streets. Taking these actions now will help prevent sewage releases and improve future maintenance.
Albina One
Rental
Under Construction
Summer 2025
Albina Vision Trust and Edlen & Co. will develop 94-units of family-focused affordable housing with priority to displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.
Kelley Point Park Project
Parks
In Planning
Planning is underway; community engagement will start in 2024
Planning is underway for a new trail connection and other improvements at Kelley Point Park, located at the confluence of the Columbia and Willamette Rivers in North Portland.
Kenton Priority Outfalls Plan
Sewer and Stormwater
In Planning
Planning work is expected to continue through early 2024.
Environmental Services is developing the Kenton Priority Outfalls Plan. This planning effort will protect public health and the environment by identifying ways to reduce pollutants in stormwater entering the Columbia Slough.
Safe Routes to School Intersection Improvements: Multiple Locations
Transportation
Upcoming
2023-2024
Upcoming crosswalk and ADA curb ramp improvement projects along Primary Investment Routes located within the Portland Public Schools (PPS) district. Funded by the 2012 PPS Bond.
Sewer repairs are anticipated to begin in June 2024 will take about six months to complete.
Environmental Services is designing a stormwater management project in the northern portion of the Kenton neighborhood. This project is part of a larger effort to improve water and sediment quality in the Columbia Slough.
NE MLK and Russell Sewer Project
Sewer and Stormwater
Active
Construction is expected to start in June 2024 and take about four months to complete.
Environmental Services is designing a project to upsize 583 feet of sewer pipe, replace 20 public sewer connections to private property, and add three new maintenance holes in the Eliot neighborhood. These improvements will reduce the possibility of sewage releases to buildings and streets.
Rosa Parks & Greeley: Crossing & Signal, N
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on N Rosa Parks Way at Greeley Avenue.
North Jantzen Avenue water main construction
Water System Improvement Construction
Under Construction
Winter 2022 to Summer 2024
We will replace approximately 2,200 feet of water main (pipe) with earthquake-resilient pipe. We will also replace five existing fire hydrants and install one new fire hydrant. This project will bring existing water services and backflow devices at several properties up to current City code.
Upper St. Johns & N Burr Neighborhood Greenways
Transportation
Engineering And Design
–
Early implementation of two North Portland in Motion Plan's recommended neighborhood greenways.
Piedmont Priority Outfalls Plan
Sewer and Stormwater
In Planning
Planning work is expected to continue through 2024.
Environmental Services is developing the Piedmont Priority Outfalls Plan. This planning effort will protect public health and the environment by identifying ways to reduce pollutants in stormwater entering the Columbia Slough.
Rosa Parks Lateral Sewer Project
Sewer and Stormwater
Active
The project is currently scheduled to begin in late Summer 2024.
Environmental Services is designing a project to repair multiple sewer lateral connections from private properties to the main sewer line. This project will reduce the risks of basement sewer backups, flooding, and emergency repairs in the future.