Construction
NE Tillamook-Hancock Neighborhood Greenway Enhancement Project (Phase II): NE 28th to NE 62nd avenues
Transportation
Under Construction
Construction in phases beginning in 2021
The Portland Bureau of Transportation (PBOT) is constructing a series of design changes on the Tillamook-Hancock Neighborhood Greenway between NE 28th and NE 62nd avenues. Phase 1 from N Flint to NE 28th was completed in 2019.
N Suttle Road Local Improvement District
Transportation
Under Construction
Spring 2023 to Summer 2024
The Portland Bureau of Transportation (PBOT) and the Bureau of Environmental Services (BES) are constructing street, sidewalk, stormwater and sanitary sewer improvements on N Suttle Road.
N Willamette Boulevard Active Transportation Corridor Project
Transportation
Engineering And Design
Design 2023-2024; Construction 2025-2026
N Willamette Blvd is an essential corridor for people traveling throughout the North Portland peninsula. PBOT is excited to have the opportunity to make a major investment to build a world-class biking, walking, and rolling corridor in North Portland.
NE MLK Jr Blvd - Corridor Safety Investment Strategy
Transportation
In Planning
2024 - 2025
The NE Martin Luther King Jr Boulevard project will enhance pedestrian crossings and reduce gaps between crossings to improve safety, access transit, and access to destinations along MLK.
N Delaware Neighborhood Greenway: N Sumner St to N Terry streets
Transportation
Engineering And Design
Construction planned for Spring 2024
The Portland Bureau of Transportation (PBOT) will create the N Delaware Greenway to establish low-stress neighborhood streets that are great places to walk, bike, roll, and play.
Safe Routes to School Intersection Improvements: Multiple Locations
Transportation
Upcoming
2023-2024
Upcoming crosswalk and ADA curb ramp improvement projects along Primary Investment Routes located within the Portland Public Schools (PPS) district. Funded by the 2012 PPS Bond.
Rosa Parks & Greeley: Crossing & Signal, N
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on N Rosa Parks Way at Greeley Avenue.
Upper St. Johns & N Burr Neighborhood Greenways
Transportation
Engineering And Design
–
Early implementation of two North Portland in Motion Plan's recommended neighborhood greenways.
N Willis Sidewalk Infill: N Newman Avenue to Chautauqua Boulevard
Transportation
Engineering And Design
Construction expected in 2024
The Portland Bureau of Transportation (PBOT) will oversee construction of new concrete sidewalk and ADA curb ramps on the south side of N Willis Boulevard between N Newman Avenue and N Chautauqua Boulevard, an essential connection for students, families and neighbors in the Portsmouth neighborhood.
See something we could improve on this page? Give website feedback.