NE Tillamook-Hancock Neighborhood Greenway Enhancement Project (Phase II): NE 28th to NE 62nd avenues
Transportation
Under Construction
Construction in phases beginning in 2021
The Portland Bureau of Transportation (PBOT) is constructing a series of design changes on the Tillamook-Hancock Neighborhood Greenway between NE 28th and NE 62nd avenues. Phase 1 from N Flint to NE 28th was completed in 2019.
Irving Park Stormwater Project
Sewer and Stormwater
Active
Major construction is complete.
Environmental Services and Portland Parks & Recreation collaborated on a project to build nature patches and rain gardens to manage stormwater in Irving Park. The project will help prevent nearby flooding, sewer basement backups, and sewage overflows into the Willamette River during storms.
Force Avenue Pump Station Project
Sewer and Stormwater
Active
Design continues. Construction of the new pump station is anticipated to begin in August of 2025 and take up to a year and a half to complete.
Environmental Services is designing a project to remodel the 48-year-old Force Avenue Pump Station in North Portland. Increased pumping capacity will accommodate growth and future demands on the sewer system. Improved reliability, access, and safety will protect public health and the environment.
N Suttle Road Local Improvement District
Transportation
Under Construction
Spring 2023 to Summer 2024
The Portland Bureau of Transportation (PBOT) and the Bureau of Environmental Services (BES) are constructing street, sidewalk, stormwater and sanitary sewer improvements on N Suttle Road.
Columbia Slough Outfall 57 Stormwater Project
Sewer and Stormwater
Active
Construction is expected to begin in January 2025 and take about one year to complete.
Environmental Services is designing a stormwater management project in the Portsmouth neighborhood to reduce the amount of pollution entering the Columbia Slough. This project is part of a larger effort to improve water and sediment quality in the Columbia Slough.
Farragut Park Improvements Project
Parks
Under Construction
Expected completion in Spring 2024
In April 2021, Parks Commissioner Carmen Rubio allocated $1.75M in System Development Charges (SDCs) to add new equipment suited for toddlers and remove ADA barriers for better playground accessibility.
NE 6th Drive Pump Station Project
Sewer and Stormwater
Active
The project is starting construction and will take about two years to complete.
Environmental Services is constructing a project to expand and remodel the 44-year-old NE 6th Drive Pump Station in the East Columbia neighborhood. The upgrades will modernize equipment, increase system capacity, and protect public health and the environment.
N Willamette Boulevard Active Transportation Corridor Project
Transportation
Engineering And Design
Design 2023-2024; Construction 2025-2026
N Willamette Blvd is an essential corridor for people traveling throughout the North Portland peninsula. PBOT is excited to have the opportunity to make a major investment to build a world-class biking, walking, and rolling corridor in North Portland.
Citywide Sump Repair and Replacement
Sewer and Stormwater
Active
Construction began in April 2023 and will continue through April 2026. Check the webpage for regular project updates.
Environmental Services is removing aging sumps throughout the City and replacing them with new sumps and new sedimentation manholes. This work will help control stormwater runoff and sewer backups.
Interstate Firehouse Cultural Center Feasibility Study
Parks
In Planning
Study completion expected Summer 2024
A feasibility study is underway which will produce market, financial, and operational analyses to determine a sustainable operating plan for IFCC – a plan that is in alignment with the community’s vision.
NE MLK Jr Blvd - Corridor Safety Investment Strategy
Transportation
In Planning
2024 - 2025
The NE Martin Luther King Jr Boulevard project will enhance pedestrian crossings and reduce gaps between crossings to improve safety, access transit, and access to destinations along MLK.
North Portland Aquatic Center Project
Parks
In Planning
Anticipated project duration: 5-7 years / Duración prevista del proyecto: 5-7 años
Portland Parks & Recreation (PP&R) is building a new indoor aquatic center to North Portland.
Dr. Darrell Millner Building
Rental
Under Construction
Winter 2024
Community Development Partners and Self-Enhancement, Inc. are building 63 units of affordable family housing in Overlook with priority to displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.
N Delaware Neighborhood Greenway: N Sumner St to N Terry streets
Transportation
Engineering And Design
Construction planned for Spring 2024
The Portland Bureau of Transportation (PBOT) will create the N Delaware Greenway to establish low-stress neighborhood streets that are great places to walk, bike, roll, and play.
N Going and Greeley Sewer Project
Sewer and Stormwater
Active
This project is currently in design and construction is not anticipated to begin until the summer of 2024.
Environmental Services is designing a project to install and replace public sewer pipes along N Going Avenue, N Going Court, N Humboldt Street, and N Greeley Street. Replacing and repairing the aging and damaged sewer pipes will help protect public health and the environment.
North River Sewer Repair Project
Sewer and Stormwater
Active
Construction is expected to start September 2024 and take about 6 months to complete.
Environmental Services is designing a project to replace deteriorating sewer pipe under North River Street between Albina and Interstate avenues. Taking these actions now reduce the possibility of costly breaks, leaks, blockages and sewage releases to buildings, streets, streams, and rivers.
North Bradford Sewer Project
Sewer and Stormwater
Active
Construction is expected to begin in July 2024 and take about 6 months to complete.
Environmental Services is designing a project to abandon a deteriorated sewer pipe under North Bradford Street between Burlington and Richmond Avenues and reroute all private connections to adjacent streets. Taking these actions now will help prevent sewage releases and improve future maintenance.
Tistilal Village
Rental
Under Construction
Summer 2024
Tistilal Village, owned by NAYA Family Center, will be redeveloped as 57 units of affordable housing with culturally specific services for Native American families in Portsmouth.
Albina One
Rental
Under Construction
Summer 2025
Albina Vision Trust and Edlen & Co. will develop 94-units of family-focused affordable housing with priority to displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.
Kelley Point Park Project
Parks
In Planning
Planning is underway; community engagement will start in 2024
Planning is underway for a new trail connection and other improvements at Kelley Point Park, located at the confluence of the Columbia and Willamette Rivers in North Portland.