NE 102nd Avenue Corridor Safety Project: NE Weidler to NE Sandy
Transportation
Under Construction
Construction of Phase 3 - Spring 2024
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
NE 122nd Ave RFFA Crossing Improvements Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave RFFA Crossing Improvements project will provide four new and/or improved crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.
East Glisan Street Update: NE 102nd to 162nd Avenues
Transportation
Under Construction
Construction in phases Spring 2018 to Summer 2024
The Portland Bureau of Transportation (PBOT) is updating the street design of NE Glisan Street from NE 102nd to 162nd avenues. This project modifies how space is allocated on NE Glisan to create new safe places to cross the street, new biking facilities, and other elements.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is actively working to improve safety for all modes along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.
NE 97th Avenue and Couch/Davis Street Local Improvement District
Transportation
Engineering And Design
Summer 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.
122nd Avenue Plan: Safety, Access, Transit
Transportation
In Planning
The122nd Avenue Plan identifies improvements to increase safety and improve access for all. Plan recommendations include changes to the street cross-section, additional enhanced crossings, lighting, signal changes, and more.
Citywide Sump Repair and Replacement
Sewer and Stormwater
Active
Construction began in April 2023 and will continue through April 2026. Check the webpage for regular project updates.
Environmental Services is removing aging sumps throughout the City and replacing them with new sumps and new sedimentation manholes. This work will help control stormwater runoff and sewer backups.
Signalized School Route Crossings
Transportation
Under Construction
In Construction
As part of a large signals package, PBOT and the Safe Routes to School program have designated five locations where contractors will build new pedestrian traffic signals and beacons. The five intersections are located on key school walking routes across Portland.
SE 155th Avenue & Main Street / Millmain Drive Local Improvement District
Transportation
Partially Open While Under Construction
Construction in April 2024
This Local Improvement District (LID) will be constructed adjacent to Parklane Park. Portland Parks and Recreation (PP&R) will be using Parks System Development Charge (SDC) funds for their participation in the LID. This project will improve access to the park and build a multimodal path.
NE Halsey Street Lighting Project
Transportation
Active
Construction begins Fall 2023
This project will improve street lighting on NE Halsey Street from 112th to 162nd avenues.
Menlo Park Water Tank Demolition
Water
Active
Spring 2024
We are demolishing the Menlo Park Tank located at 101 SE 127th Avenue.