Construction
Oliver Station
Rental
Open
Summer 2018
Developed by Palindrome Communities, Oliver Station adds 125 units of affordable, transit-oriented housing to the Lents Town Center.
Lents Commons
Rental
Open
Spring 2018
Lents Commons offers 16 affordable apartments along with market-rate housing and retail space in the Lents Town Center.
SE Foster-Woodstock Couplet
Transportation
Engineering And Design
Construction 2024
This project comprises Phase Two of the Lents Town Center Improvements. It will address long-deferred roadway maintenance needs as well as provide safety improvements for all modes of transportation.
Woody Guthrie
Rental
Open
Summer 2019
Rose CDC’s Woody Guthrie Place provides 64 units of affordable and workforce housing in the Lents Town Center.
Springwater Wetlands and Floodplain Restoration Project
Sewer and Stormwater
Active
Design for the project began in Fall 2019. Construction is expected to begin in the Spring of 2024 and will take about a year and a half to complete.
Environmental Services is designing a project to enhance wetlands on about 30 acres along the Springwater Corridor Trail. The project will reduce the risk of flooding to homes, businesses and streets.
82nd Avenue Critical Fixes: Street Lighting
Transportation
Under Construction
Construction begins June 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.
82nd Avenue Critical Fixes
Transportation
Active
Multiple projects in construction 2022 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.
Lents Crossing: SE 92nd & Ellis, SE 92nd and Rural, and SE Woodstock & 86th
Transportation
Under Construction
Fall 2022
Crossing improvements at three intersections will include paving, striping, grading, drainage and curb ramp construction.
Advisory Shoulders & Bike Lanes 2023 Projects
Transportation
Upcoming
Construction in 2023 and 2024
PBOT is planning to install advisory shoulders lanes in three locations in Portland in 2023. Advisory shoulders and bike lanes are a low-cost, low-impact treatment for narrow streets with lower volumes of traffic and speeds.
SE Steele Street Pathway Project
Transportation
Engineering And Design
Construction expected in 2024
Crews contracted by PBOT will construct a walking space between SE 92nd Avenue and the Interstate 205 multi-use path along SE Steele Street and update two corner curb ramps on the east side of the intersection.
82nd Avenue Critical Fixes: Major Maintenance
Transportation
Engineering And Design
Construction 2024-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make urgent safety and maintenance improvements to 2.5 miles of NE 82nd Avenue from Fremont Street to Schuyler Street and SE 82nd Avenue from Mill Street to Foster Road.
Foster Rd & 111th: Crossing & Signal, SE
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on SE Foster Road at 111th Avenue/Drive.