Construction

Construction Menu
6 projects found
Construction: Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland by paving gravel streets, adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.

SW Capitol Highway Street Lighting

Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on SW Capitol Highway and 49th from SW Barbur to Stephenson.
Construction set to be completed in summer 2024.
Design and implement a neighborhood greenway along SW Ridge Drive and SW Wilbard Street between SW 35th Drive and SW Taylors Ferry Road. Project by the Portland Bureau of Transportation (PBOT).

SW 45th Flower Pl. to Vermont St. Pavement Project

Transportation
Engineering And Design
Construction from August 2024 to December 2024
PBOT will place new Aspalt Concrete along SW 4th. Ave. from SW Vermont St. to SW Cameron Rd. This project will also include new pedestrian crossings, multi-use paths, ADA Ramps, roadway striping and new sidewalks.