Construction
Tryon-Stephens Neighborhood Street Improvement Project- SW Capitol Hill Rd
Transportation
Engineering And Design
Construction: Late Winter/Early Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland as part of SW Tryon Stephens Transportation Infrastructure Charge (LTIC) by paving gravel streets, adding sidewalks or walkways, or a combination.
SW Galeburn: SW Capitol Highway to SW 41st Ave Street Improvement Project
Transportation
Engineering And Design
Construction: Spring 2025
SW Galeburn Street Improvement Project will include paving gravel streets, installing stormwater facilities, and adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
SW Taylors Ferry & SW 17th Ave Crossing Improvement
Transportation
Engineering And Design
Construction completed by Summer 2024.
The Portland Bureau of Transportation (PBOT) will create a safer crossing at SW Taylors Ferry Road and SW 17th Avenue by striping a crosswalk and creating a safer walking shoulder along SW 17th from Orchid to Taylors Ferry to provide a link in the Hillsdale – Lake Oswego Trail.
SW Troy Neighborhood Greenway
Transportation
Engineering And Design
Construction to be complete by spring 2025
Design and implement a neighborhood greenway along SW Canby Court/Troy Street between SW Capitol Highway and SW Capitol Hill Road. Project by the Portland Bureau of Transportation (PBOT).
SW 19th Bike Lanes- SW Barbur Blvd to SW Spring Garden St
Transportation
Engineering And Design
Construction date TBD
This PBOT project will restripe the road on SW 19th Ave from SW Spring Garden St to SW Barbur Blvd to install bike lanes on both sides of SW 19th Ave.
SW 45th Flower Pl. to Vermont St. Pavement Project
Transportation
Engineering And Design
Construction from August 2024 to December 2024
PBOT will place new Aspalt Concrete along SW 4th. Ave. from SW Vermont St. to SW Cameron Rd. This project will also include new pedestrian crossings, multi-use paths, ADA Ramps, roadway striping and new sidewalks.
See something we could improve on this page? Give website feedback.