Construction
70s Neighborhood Greenway: SE Flavel to NE Sacramento
Transportation
Under Construction
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
Sidewalk Infill: SE Washington St: 80th-82nd
Transportation
Engineering And Design
Construction scheduled for late summer/early fall 2024.
The Portland Bureau of Transportation (PBOT) is infilling sidewalk along the south side of SE Washington St from SE 80th Ave to 82nd Ave and closure of several driveways. The project is funded by Fixing Our Streets and Civil Rights Education and Enforcement Center (CREEC).
Jade and Montavilla Multimodal Improvements Project
Transportation
Engineering And Design
Construction 2024
The Portland Bureau of Transportation (PBOT) will construct improvements on key pedestrian and bicycle routes in the Jade District and Montavilla neighborhood, connecting various neighborhood hubs in Southeast Portland.
82nd Avenue Critical Fixes: Beech and Ash Crossings
Transportation
Under Construction
Construction 2023 - 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian safety improvements to 82nd Avenue at NE Beech Street and at SE Ash Street.
82nd Avenue Critical Fixes: Street Lighting
Transportation
Engineering And Design
Construction begins 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
Citywide Sump Repair and Replacement
Sewer and Stormwater
Active
Construction began in April 2023 and will continue through April 2026. Check the webpage for regular project updates.
Environmental Services is removing aging sumps throughout the City and replacing them with new sumps and new sedimentation manholes. This work will help control stormwater runoff and sewer backups.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.
82nd Avenue Critical Fixes
Transportation
Active
Multiple projects in construction 2022 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.
Signalized School Route Crossings
Transportation
Under Construction
In Construction
As part of a large signals package, PBOT and the Safe Routes to School program have designated five locations where contractors will build new pedestrian traffic signals and beacons. The five intersections are located on key school walking routes across Portland.
Aldea at Glisan Landing
Rental
Under Construction
Winter 2025
Related Northwest and IRCO are partnering to develop 96 units of affordable housing in Montavilla serving families.
Beacon at Glisan Landing
Rental
Under Construction
Fall 2024
Related Northwest and Catholic Charities are partnering to develop 41 units of affordable housing in Montavilla serving people exiting homelessness.
SE 89th Avenue & Taylor Street Local Improvement District
Transportation
Engineering And Design
Late 2024
This Local Improvement District (LID) will construct street and sidewalk improvements on portions of SE Taylor Street and SE 89th Avenue next to Berrydale Park.
82nd Avenue Critical Fixes: Glisan and Davis Signal Improvements
Transportation
Engineering And Design
Construction 2025-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including rebuilding signals at NE 82nd Avenue at Glisan and Davis streets.
Jolene's Second Cousin
Rental
In Planning
2025
Guerrilla Development Co. will develop Jolene’s Second Cousin, an innovative housing project located in Montavilla. The two-story, 3,600 square foot project consists of 11 single room occupancy (SRO) units targeted to serve very low-income, formerly homeless individuals.
PCC Southeast Affordable Housing
Rental
In Planning
2026
Our Just Future will develop 124 units of affordable housing on 1.61 acres made available for development by Portland Community College. The project will include 63 family-sized units and 20 units at 30% AMI.
82nd Avenue Critical Fixes: Major Maintenance
Transportation
Engineering And Design
Construction 2024-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make urgent safety and maintenance improvements to 2.5 miles of NE 82nd Avenue from Fremont Street to Schuyler Street and SE 82nd Avenue from Mill Street to Foster Road.
SE Stark & Washington Street Safety Project
Transportation
In Planning
–
A safety improvement project including travel lane reconfiguration, ADA upgrades, crossing enhancements, and enhanced bike lanes on Stark and Washington between 92nd and 106th. Design should occur in 2024 with construction in 2025-2026.
Water Main Flushing - SW Portland
Water Main Flushing
Active
Summer/Fall 2024
Hydrant flushing is how Portland cleans the interior of its drinking water pipes to maintain excellent drinking water quality.
See something we could improve on this page? Give website feedback.