Construction
NE Killingsworth Safer Crossings Project
Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.
Water Main Flushing
Water Main Flushing
Active
Spring/Summer 2024
Hydrant flushing is how Portland cleans the inside of its drinking water pipes and maintains excellent drinking water quality.
See something we could improve on this page? Give website feedback.