Construction
Oak Leaf Mobile Home Park
Rental
Open
Spring 2019
St. Vincent de Paul has purchased the Oak Leaf Mobile Home Park to preserve 22 affordable homes in Cully.
NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2024
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.
NE 42nd Avenue Bridge Replacement (over Lombard Street)
Transportation
Engineering And Design
Construction TBD
The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the upcoming NE 47th Avenue protected bikeway.
NE Cornfoot Road Corridor Improvements (47th Avenue to Alderwood Road)
Transportation
Engineering And Design
Construction will begin in spring of 2024
The Portland Bureau of Transportation (PBOT) will be repaving NE Cornfoot Road from Airtrans Way to Alderwood Road. Upgrade streetlights and install guardrails. A second project phase in 2026 will add a multi-use path on the north side for people walking and biking.
70s Greenway: Cully Connector
Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
Hayu Tilixam
Rental
Open
Fall 2022
Hayu Tilixam is Community Development Partners’ new 50-unit, affordable multifamily construction project in Cully.
Las Adelitas
Rental
Open
Fall 2022
Hacienda CDC constructed Las Adelitas, a new 142-unit multifamily project, in NE Portland’s Cully neighborhood.
Cully Neighborhood Street Improvement Project
Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.
82nd Avenue Critical Fixes: Street Lighting
Transportation
Engineering And Design
Construction begins 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
NE Killingsworth Street Lighting
Transportation
In Planning
Construction 2023 - 2024
This project will improve streetlighting on NE Killingsworth Street from 42nd to NE Lombard Street.
NE 46th Avenue & Bryant Street Local Improvement District
Transportation
Partially Open While Under Construction
2024-25
The Portland Bureau of Transportation (PBOT) is constructing Local Improvement District street improvements on NE 42nd Avenue, 46th Avenue, & Bryant Street. Phase 1 includes a new traffic signal, curb ramps, crosswalks, sidewalks, street lighting, and trees. Phase 2 includes additional improvements.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.
82nd Avenue Critical Fixes
Transportation
Active
Multiple projects in construction 2022 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.
Killingsworth Street Repaving and Safety Improvements
Transportation
Engineering And Design
Construction starts Summer 2024
Portland Bureau of Transportation (PBOT) will repave and add safety improvements to NE Killingsworth Street from 53rd Avenue to Cully Boulevard in the summer of 2024.
Mejoras de seguridad y repavimentación de la calle Killingsworth
Transportación
Ingeniería Y Diseño
–
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard
Mason/Skidmore Neighborhood Greenway Project
Transportation
In Planning
Coming in 2024
The Mason/Skidmore Greenway will be a new east-west neighborhood greenway connecting to existing north-south greenways at NE 37th Avenue, NE Cully Blvd, and NE 77th Avenue.
NE Killingsworth Safer Crossings Project
Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.
PCC Killingsworth
Rental
In Planning
Fall 2025
Home Forward will co-locate 84 units of family-focused affordable housing in Cully with a new Workforce Development Center operated by Portland Community College.
See something we could improve on this page? Give website feedback.