Construction
Beatrice Morrow
Rental
Open
Fall 2018
The 80-unit Beatrice Morrow apartments, completed by PCRI in the Eliot neighborhood, serves displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.
Blackburn Center
Rental
Open
Summer 2019
Central City Concern’s Blackburn Center combines 124 units of affordable housing with an on-site clinic and services for medical and mental health and recovery.
Oak Leaf Mobile Home Park
Rental
Open
Spring 2019
St. Vincent de Paul has purchased the Oak Leaf Mobile Home Park to preserve 22 affordable homes in Cully.
Hazel Heights
Rental
Open
Winter 2018
Hazel Heights is Central City Concern’s 153-unit affordable housing development in Hazelwood.
Gladstone Square / Multnomah Manor
Rental
Open
Winter 2018
Home Forward renovated Gladstone Square and Multnomah Manor, two family-focused properties in Northeast and Southeast Portland, to preserve affordable housing and prevent the displacement of low-income households.
East Burnside
Rental
Open
Spring 2018
The Portland Housing Bureau purchased the 51-unit East Burnside Apartments after completion and is operating the building, located in the Hazelwood neighborhood, as regulated affordable housing.
Louisa Flowers
Rental
Open
Fall 2019
Home Forward’s mixed-use, 240-unit Louisa Flowers project, located in the amenity-rich Lloyd District, is the largest affordable housing building completed in Portland in five decades.
NE 102nd Avenue Corridor Safety Project: NE Weidler to NE Sandy
Transportation
Under Construction
Construction of Phase 3 - Spring 2024
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
The Ellington
Rental
Open
Fall 2018
The Portland Housing Bureau purchased and renovated the Ellington, converting its 263 market-rate units to dedicated affordable housing for families in the Madison South neighborhood.
Magnolia II
Rental
Open
Winter 2020
Magnolia II by Innovative Housing, Inc. adds 50 units of affordable housing to the Eliot neighborhood, with priority given to displaced or longtime residents of North/Northeast Portland through the City’s Preference Policy.
NE 122nd Ave RFFA Crossing Improvements Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave RFFA Crossing Improvements project will provide four new and/or improved crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.
70s Neighborhood Greenway: SE Flavel to NE Sacramento
Transportation
Under Construction
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2025
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.
East Glisan Street Update: NE 102nd to 162nd Avenues
Transportation
Under Construction
Construction in phases Spring 2018 to Summer 2024
The Portland Bureau of Transportation (PBOT) is updating the street design of NE Glisan Street from NE 102nd to 162nd avenues. This project modifies how space is allocated on NE Glisan to create new safe places to cross the street, new biking facilities, and other elements.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
NE Cornfoot Road Corridor Improvements (47th Avenue to Alderwood Road)
Transportation
Engineering And Design
Construction will begin in spring of 2024
The Portland Bureau of Transportation (PBOT) will be repaving NE Cornfoot Road from Airtrans Way to Alderwood Road. Upgrade streetlights and install guardrails. A second project phase in 2026 will add a multi-use path on the north side for people walking and biking.
NE 42nd Avenue Bridge Replacement (over Lombard Street)
Transportation
Engineering And Design
Construction in fall of 2024
The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the upcoming NE 47th Avenue protected bikeway.
SE Washington St Sidewalk Infill Project- SE 80th Ave to SE 82nd Ave
Transportation
Engineering And Design
Construction scheduled for fall 2024.
The Portland Bureau of Transportation (PBOT) is installing new curbs ramps, sidewalk along the south side of SE Washington St from SE 80th Ave to SE 82nd Ave and installing a new sump. The project is funded by Fixing Our Streets and Civil Rights Education and Enforcement Center (CREEC).
Central Eastside Access and Circulation project
Transportation
Engineering And Design
Construction scheduled for 2023-2024
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is actively working to improve safety for all modes along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.
See something we could improve on this page? Give website feedback.