Construction
SE 150th and Division Street Park Master Plan
Parks
In Planning
The master plan for SE 150th and Division Street Park reflects a collaborative effort involving neighbors and community groups to create a welcoming space with activities for people of all ages.
Mt. Scott Community Center Seismic Retrofit and Expansion Project
Parks
In Planning
Completion expected in 2025
Portland Parks & Recreation (PP&R) is preparing to rehabilitate and expand Mt. Scott Community Center (MSCC) to better serve current and future generations of Portlanders. The existing Mt. Scott pool and gymnasium will remain as is, along with the popular indoor skating rink.
Greenleaf Tank 3
Capital Improvement Project
In Planning
November 2023 to February 2025
As part of the Water Bureau's efforts to increase the amount of water available on Portland's west side for firefighting and earthquake preparedness, we will construct a new 175,000-gallon water storage tank in Forest Park.
122nd Avenue Plan: Safety, Access, Transit
Transportation
In Planning
The122nd Avenue Plan identifies improvements to increase safety and improve access for all. Plan recommendations include changes to the street cross-section, additional enhanced crossings, lighting, signal changes, and more.
Midland Park Master Plan
Parks
In Planning
Master Plan approved by City Council in November 2017
The Master Plan for Mill Park was drawn from the thoughtful ideas and feedback provided by diverse communities in East Portland. It reflects a collaboration involving neighbors and community groups to create a welcoming space with activities for people of all ages.
Berrydale Park Improvement Project
Parks
In Planning
Construction will begin in Fall 2024. Completion expected in Fall 2025.
Skatepark and other robust improvements are planned for Berrydale Park in Southeast Portland.
Interstate Firehouse Cultural Center Feasibility Study
Parks
In Planning
Study completion expected Summer 2024
A feasibility study is underway which will produce market, financial, and operational analyses to determine a sustainable operating plan for IFCC – a plan that is in alignment with the community’s vision.
NE MLK Jr Blvd - Corridor Safety Investment Strategy
Transportation
In Planning
2024 - 2025
The NE Martin Luther King Jr Boulevard project will enhance pedestrian crossings and reduce gaps between crossings to improve safety, access transit, and access to destinations along MLK.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.
North Portland Aquatic Center Project
Parks
In Planning
Anticipated project duration: 5-7 years / Duración prevista del proyecto: 5-7 años
Portland Parks & Recreation (PP&R) is building a new indoor aquatic center to North Portland.
South Macadam Avenue water main replacement
Water
In Planning
Spring 2024 to winter 2025
The Water Bureau is investing in reliable water supply in South Portland. We will replace 980 feet of water main (pipe) and two hydrants on South Macadam Avenue between South Bancroft Street and South Lane Street.
Red Electric Trail
Parks
In Planning
Design work begins Fall 2022
This project will create design and construction drawings to build a western segment of the Red Electric Trail, from SW Shattuck Road to SW Cameron Road. The trail will eventually connect to PBOT's recently constructed bridge within the eastern edge of the trail.
Inverness System Planning Project
Sewer and Stormwater
In Planning
This project is in the planning phase. Planning and analysis will continue through the summer of 2024.
The Inverness pump station and force main system (The Inverness System) is nearing the end of its service life, and is in need of repair or replacement. This project will choose a preferred solution for repair and/or replacement that protects public health and the environment.
hollywoodHUB
Rental
In Planning
Summer 2026
BRIDGE Housing will develop hollywoodHUB to add 222 units of affordable, transit-oriented housing for families and individuals in the Hollywood neighborhood.
The Clifford
Rental
In Planning
TBD
Innovative Housing, Inc. is renovating the Clifford to preserve 88 units for highly vulnerable individuals in the Central Eastside URA.
NE Columbia Boulevard at NE 11th Pedestrian Crossing
Transportation
In Planning
Currently in planning phase
The Portland Bureau of Transportation (PBOT) plans to construct a median island pedestrian crossing adjacent to the Oregon Human Society building at NE Columbia Boulevard at NE 11th Ave.
Kelley Point Park Project
Parks
In Planning
Planning is underway; community engagement will start in 2024
Planning is underway for a new trail connection and other improvements at Kelley Point Park, located at the confluence of the Columbia and Willamette Rivers in North Portland.
Kenton Priority Outfalls Plan
Sewer and Stormwater
In Planning
Planning work is expected to continue through early 2024.
Environmental Services is developing the Kenton Priority Outfalls Plan. This planning effort will protect public health and the environment by identifying ways to reduce pollutants in stormwater entering the Columbia Slough.
North Parks Blocks Extension
Parks
In Planning
Expected completion of PNCA Block in Spring 2027
This project will extend the North Parks Block to include the "PNCA Block," the block between NW Hoyt and Glisan Streets. It will also include park blocks further north, to be developed fully at a later date.
Creston Park Skatepark Project
Parks
In Planning
Anticipated completion: Spring 2026
A new, covered skatepark is being planned for Creston Park. This will be the very first covered skatepark in the PP&R system.