Construction
NE Tillamook-Hancock Neighborhood Greenway Enhancement Project (Phase II): NE 28th to NE 62nd avenues
Transportation
Under Construction
Construction in phases beginning in 2021
The Portland Bureau of Transportation (PBOT) is constructing a series of design changes on the Tillamook-Hancock Neighborhood Greenway between NE 28th and NE 62nd avenues. Phase 1 from N Flint to NE 28th was completed in 2019.
N Suttle Road Local Improvement District
Transportation
Under Construction
Spring 2023 to Summer 2024
The Portland Bureau of Transportation (PBOT) and the Bureau of Environmental Services (BES) are constructing street, sidewalk, stormwater and sanitary sewer improvements on N Suttle Road.
N Going and Greeley Sewer Project
Sewer and Stormwater
Active
This project is currently in design and construction is not anticipated to begin until the summer of 2024.
Environmental Services is designing a project to install and replace public sewer pipes along N Going Avenue, N Going Court, N Humboldt Street, and N Greeley Street. Replacing and repairing the aging and damaged sewer pipes will help protect public health and the environment.
Tistilal Village
Rental
Under Construction
Summer 2024
Tistilal Village, owned by NAYA Family Center, will be redeveloped as 57 units of affordable housing with culturally specific services for Native American families in Portsmouth.
North Jantzen Avenue water main construction
Water System Improvement Construction
Under Construction
Winter 2022 to Summer 2024
We will replace approximately 2,200 feet of water main (pipe) with earthquake-resilient pipe. We will also replace five existing fire hydrants and install one new fire hydrant. This project will bring existing water services and backflow devices at several properties up to current City code.
Upper St. Johns & N Burr Neighborhood Greenways
Transportation
Engineering And Design
–
Early implementation of two North Portland in Motion Plan's recommended neighborhood greenways.
Water Main Flushing
Water Main Flushing
Active
Spring and Summer 2024
Hydrant flushing is how Portland cleans the inside of its drinking water pipes and maintains excellent drinking water quality.
N Willis Sidewalk Infill: N Newman Avenue to Chautauqua Boulevard
Transportation
Engineering And Design
Construction expected in 2024
The Portland Bureau of Transportation (PBOT) will oversee construction of new concrete sidewalk and ADA curb ramps on the south side of N Willis Boulevard between N Newman Avenue and N Chautauqua Boulevard, an essential connection for students, families and neighbors in the Portsmouth neighborhood.
See something we could improve on this page? Give website feedback.