information
Portland is a Sanctuary City

Construction

Construction Menu
267 projects found

Green Leaf Tank 3

Water
Upcoming
November 2025
This project will construct a new 175,000-gallon steel water storage tank that meets current seismic standards and install associated 12-inch pipe connections to remove Greenleaf Tank 1 from the system.
November 2025
This project will replace the Motor Control Center (MCC’s), transformer, service disconnect, and overall electrical safety and security improvements.
November 2025
This project will replace existing appurtenances associated with the three (3) Howell-Bunger valves at Dam 2, including the actuators, external linkages and gearboxes, control infrastructure, electrical service and panels, and the arial cable.

Mt. Tabor Interpretive

Water
Upcoming
November 2025
This project will develop an interpretive program to educate the public about the history of the Mt. Tabor Reservoirs in particular and the City of Portland's overall potable water system.

Headworks Road Rehab

Water
Upcoming
December 2025
The project requires widening, repairing, and repaving 1.6 miles of road, installing a guardrail, and installing a stoplight.

SW Bertha Boulevard (SW Vermont St. to SW Barbur Blvd.)

Transportation
Engineering And Design
The Portland Bureau of Transportation (PBOT) will reconfigure this roadway as a protected bike lane. The project limits are along S Bertha Blvd. from SW Vermont St. to SW Barbur Blvd. The intent is to reorganize the roadway to provide protected bike lanes.

Page menu

Back to top