SW Bertha Boulevard (SW Vermont St. to SW Barbur Blvd.)

Transportation
Engineering And Design
The Portland Bureau of Transportation (PBOT) will reconfigure this roadway as a protected bike lane. The project limits are along S Bertha Blvd. from SW Vermont St. to SW Barbur Blvd. The intent is to reorganize the roadway to provide protected bike lanes.
A safety improvement project including travel lane reconfiguration, ADA upgrades, crossing enhancements, and enhanced bike lanes on Stark and Washington between 92nd and 106th. Design should occur in 2024 with construction in 2025-2026.

Foster Rd & 111th: Crossing & Signal, SE

Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on SE Foster Road at 111th Avenue/Drive.

NE Killingsworth Street Lighting

Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on NE Killingsworth Street from 42nd to NE Lombard Street.

SW 45th Flower Pl. to Vermont St. Pavement Project

Transportation
Engineering And Design
Construction from August 2024 to December 2024
PBOT will place new Aspalt Concrete along SW 4th. Ave. from SW Vermont St. to SW Cameron Rd. This project will also include new pedestrian crossings, multi-use paths, ADA Ramps, roadway striping and new sidewalks.







NE Glisan Street and 80th Avenue Crossing Improvements

Transportation
Engineering And Design
In Design - 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make pedestrian crossing improvements at NE Glisan Street and 80th Avenue.

NW Johnson & Kearney Street Extension Project

Transportation
Engineering And Design
A project building new streets which extend NW Kearney and NW Johnson Streets through the USPS Redevelopment site.