Construction
SW Troy Neighborhood Greenway
Transportation
Engineering And Design
Construction to be complete by spring 2025
Design and implement a neighborhood greenway along SW Canby Court/Troy Street between SW Capitol Highway and SW Capitol Hill Road. Project by the Portland Bureau of Transportation (PBOT).
SW Taylors Ferry & SW 17th Ave Crossing Improvement
Transportation
Engineering And Design
Construction completed by Summer 2024.
The Portland Bureau of Transportation (PBOT) will create a safer crossing at SW Taylors Ferry Road and SW 17th Avenue by striping a crosswalk and creating a safer walking shoulder along SW 17th from Orchid to Taylors Ferry to provide a link in the Hillsdale – Lake Oswego Trail.
SE 89th Avenue & Taylor Street Local Improvement District
Transportation
Engineering And Design
Late 2024
This Local Improvement District (LID) will construct street and sidewalk improvements on portions of SE Taylor Street and SE 89th Avenue next to Berrydale Park.
Safe Routes to School Intersection Improvements: Multiple Locations
Transportation
Upcoming
2023-2024
Upcoming crosswalk and ADA curb ramp improvement projects along Primary Investment Routes located within the Portland Public Schools (PPS) district. Funded by the 2012 PPS Bond.
NE Columbia Boulevard at NE 11th Pedestrian Crossing
Transportation
In Planning
Currently in planning phase
The Portland Bureau of Transportation (PBOT) plans to construct a median island pedestrian crossing adjacent to the Oregon Human Society building at NE Columbia Boulevard at NE 11th Ave.
82nd Avenue Critical Fixes: Glisan and Davis Signal Improvements
Transportation
Engineering And Design
Construction 2025-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including rebuilding signals at NE 82nd Avenue at Glisan and Davis streets.
SE 174th Avenue Sidewalk Infill (Main to Stark streets)
Transportation
Under Construction
In construction
The Portland Bureau of Transportation (PBOT) will oversee construction of a 10-foot concrete sidewalk for pedestrians and people biking on the west side of SE 174th Avenue between Stark and Main streets. Project includes new ADA-compliant curb ramps, marked crosswalks, and street trees.
Advisory Shoulders & Bike Lanes 2023 Projects
Transportation
Upcoming
Construction in 2023 and 2024
PBOT is planning to install advisory shoulders lanes in three locations in Portland in 2023. Advisory shoulders and bike lanes are a low-cost, low-impact treatment for narrow streets with lower volumes of traffic and speeds.
NE Shaver Sidewalk Infill: NE 115th to Parkrose Middle School
Transportation
Upcoming
Construction expected to begin Summer 2024
Contractors will build sidewalk on the south side of NE Shaver Street between NE 115th Avenue and Parkrose Middle School campus.
NW Reed Drive Local Improvement District
Transportation
Engineering And Design
Summer 2024
This Local Improvement District (LID) will construct street improvements on NW Reed Drive west of NW 83rd Place to the western terminus of the right-of-way.
Brentwood-Darlington Crossroads Safety Project: SE Flavel Street at SE 72nd Avenue
Transportation
Engineering And Design
Design in 2023-2024 and Construction in Summer 2025
This intersection safety project will rebuild the signal at SE Flavel and SE 72nd to include dedicated left hand turns and will add additional illumination to the intersection. The project will also update corner ramps to current ADA standards and improve poor pavement conditions.
NE Killingsworth Safer Crossings Project
Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.
N Willis Sidewalk Infill: N Newman Avenue to Chautauqua Boulevard
Transportation
Engineering And Design
Construction expected in 2024
The Portland Bureau of Transportation (PBOT) will oversee construction of new concrete sidewalk and ADA curb ramps on the south side of N Willis Boulevard between N Newman Avenue and N Chautauqua Boulevard, an essential connection for students, families and neighbors in the Portsmouth neighborhood.
Safe Routes to School Program Traffic Calming: Multiple Locations
Transportation
Active
Ongoing
Traffic calming projects funded by the Safe Routes to School (SRTS) program. Streets located along, and crossing, the SRTS Primary Investment Routes are considered for speed bumps and cushions.
NE Shaver Sidewalk Infill: NE 102nd to NE 115th avenues
Transportation
In Planning
Summer 2025
Construction crews will build sidewalk and new ADA curb ramps on the south side of NE Shaver Street to connect this key school route for Parkrose Middle and High School students.
SE 174th Ave Sidewalk Infill (Kelly to Francis streets)
Transportation
In Planning
2025-26
Construction crews will build sidewalk on the west side of SE 174th Avenue to connect neighborhood streets to Powell Butte Elementary School. New crosswalks and ADA ramps will also be installed at SE Haig Dr and SE Marie St.
Rosa Parks & Greeley: Crossing & Signal, N
Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on N Rosa Parks Way at Greeley Avenue.
NE Halsey Street Lighting Project
Transportation
Active
Construction begins Fall 2023
This project will improve street lighting on NE Halsey Street from 112th to 162nd avenues.
SE Steele Street Pathway Project
Transportation
Engineering And Design
Construction expected in 2024
Crews contracted by PBOT will construct a walking space between SE 92nd Avenue and the Interstate 205 multi-use path along SE Steele Street and update two corner curb ramps on the east side of the intersection.
SW Bertha Boulevard (SW Vermont St. to SW Barbur Blvd.)
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) will reconfigure this roadway as a protected bike lane. The project limits are along S Bertha Blvd. from SW Vermont St. to SW Barbur Blvd. The intent is to reorganize the roadway to provide protected bike lanes.
See something we could improve on this page? Give website feedback.