Construction
Beatrice Morrow
Rental
Open
Fall 2018
The 80-unit Beatrice Morrow apartments, completed by PCRI in the Eliot neighborhood, serves displaced or longtime residents of North/Northeast Portland under the City’s Preference Policy.

Blackburn Center
Rental
Open
Summer 2019
Central City Concern’s Blackburn Center combines 124 units of affordable housing with an on-site clinic and services for medical and mental health and recovery.

Oak Leaf Mobile Home Park
Rental
Open
Spring 2019
St. Vincent de Paul has purchased the Oak Leaf Mobile Home Park to preserve 22 affordable homes in Cully.

Hazel Heights
Rental
Open
Winter 2018
Hazel Heights is Central City Concern’s 153-unit affordable housing development in Hazelwood.

Gladstone Square / Multnomah Manor
Rental
Open
Winter 2018
Home Forward renovated Gladstone Square and Multnomah Manor, two family-focused properties in Northeast and Southeast Portland, to preserve affordable housing and prevent the displacement of low-income households.

East Burnside
Rental
Open
Spring 2018
The Portland Housing Bureau purchased the 51-unit East Burnside Apartments after completion and is operating the building, located in the Hazelwood neighborhood, as regulated affordable housing.

Louisa Flowers
Rental
Open
Fall 2019
Home Forward’s mixed-use, 240-unit Louisa Flowers project, located in the amenity-rich Lloyd District, is the largest affordable housing building completed in Portland in five decades.

4M Neighborhood Greenway: SE 130th Avenue to SE 174th Avenue
Transportation
Under Construction
Construction started in September 2022
The 4M Neighborhood Greenway will be constructed on SE Mill St., SE Millmain Dr., and SE Main St. between SE 130th Ave. and SE 174th Ave. It will create new opportunities for people to walk, bike, and roll on streets running parallel to the high-traffic SE Stark and SE Division corridors.

The Ellington
Rental
Open
Fall 2018
The Portland Housing Bureau purchased and renovated the Ellington, converting its 263 market-rate units to dedicated affordable housing for families in the Madison South neighborhood.

East Portland Access to Employment and Education: 4M, 100s, and 150s Neighborhood Greenways
Transportation
Under Construction
Construction December 2020-Oct 2023
The majority of this project has been completed. Sidewalks, street crossings, bikeway facilities, paved paths, and other safety improvements have been constructed on the 150s Neighborhood Greenway and the 100s Neighborhood Greenway. Work is ongoing for a portion of the 4M Neighborhood Greenway.

Magnolia II
Rental
Open
Winter 2020
Magnolia II by Innovative Housing, Inc. adds 50 units of affordable housing to the Eliot neighborhood, with priority given to displaced or longtime residents of North/Northeast Portland through the City’s Preference Policy.

Montavilla Park Picnic Shelter
Parks
In Planning
Fall 2021
In March 2019, Portland Parks & Recreation received a safety and structural stability assessment of Montavilla Park’s picnic shelter. The report indicates that the structure is presumed to be unsafe and must be removed to ensure visitor safety.
NE 122nd Ave Multimodal Safety and Access Improvement Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave Multimodal Safety and Access Improvement Project will provide four new enhanced crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.

70s Neighborhood Greenway: NE Sacramento to SE Flavel
Transportation
Engineering And Design
Construction Spring 2023
The Portland Bureau of Transportation (PBOT) is constructing a new neighborhood greenway route between NE Sacramento and SE Flavel around the 70s avenues.

NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2024
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.

NE Cornfoot Road Corridor Improvements: NE 47th Avenue to NE Alderwood Road
Transportation
Engineering And Design
Construction Summer of 2023
This project will make improvements to NE Cornfoot Road from Airtrans to NE Alderwood Road.

60s Greenway: North of NE Klickitat Street
Transportation
In Planning
Construction 2023 or 2024
PBOT will add a new northern segment to the recently completed 70s Greenway that currently ends at NE Klickitat Street.
NE Halsey Street Safety and Access to Transit Project: NE 68th Ave to NE 92nd Ave
Transportation
Engineering And Design
Construction planned to begin 2023
The Portland Bureau of Transportation (PBOT) will construct safety improvements such as crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more along NE Halsey Street.

NE 42nd Ave Bridge over NE Lombard
Transportation
Engineering And Design
Construction fall of 2023
The Portland Bureau of Transportation is constructing a new earthquake-ready bridge to fill the gap between the Holman Neighborhood Greenway and the upcoming 47th Ave protected bikeway, while providing better access for freight, walking, and biking.

Sidewalk Infill: SE Washington St: 80th-82nd
Transportation
Engineering And Design
Construction scheduled for 2024.
The Portland Bureau of Transportation (PBOT) is infilling sidewalk along the south side of SE Washington St from SE 80th Ave to 82nd Ave and closure of several driveways. The project is funded by Fixing Our Streets and Civil Rights Education and Enforcement Center (CREEC).

See something we could improve on this page? Give website feedback.