Construction
West Burnside Multimodal Project
Transportation
Engineering And Design
Completed 2018
This project will implement the Preferred Alternative Design developed in the West Burnside Multimodal Study, improving pedestrian and bicycle access across W Burnside at 18th and 19th, as well as access to TriMet.

NW/SW 20th Ave Neighborhood Greenway: Raleigh to Jefferson
Transportation
Under Construction
Phase 2 construction completion awaiting building construction to finish.
This project will improve conditions pedestrians and people biking by reducing vehicle speeding, reducing auto traffic volumes, upgrading crossings of busy streets, and creating new connections to existing bicycle and pedestrian infrastructure on or near SW and NW 20th Ave.

Lower Northwest Sewer and Stormwater Project
Sewer and Stormwater
Active
The overall project is still in the early investigation and evaluation phases. Engineering design work will begin in 2022 and will potentially be completed in the spring of 2024. Construction will begin sometime after the end of design.
The Lower Northwest Sewer and Stormwater project will replace or repair aging sewer pipes in the Northwest and Pearl districts. This project will protect the public and the environment by reducing the possibility of street flooding and sewage releases to homes, businesses and streets.
SW 17th Avenue Sewer Extension Project
Sewer and Stormwater
Active
The project is currently in the design phase. Construction is expected to begin in August 2023 and should take about four to six weeks.
Environmental Services is extending the public sewer in SW 17th Avenue, north of SW Clifton Street. This work is part of the City’s ongoing effort to provide property owners a way to directly and independently connect to the public sewer system in order to meet current City Code requirements.
W Burnside Street at St. Clair Avenue Pedestrian Crossing
Transportation
Engineering And Design
2024-25
This project will add a pedestrian crossing with a traffic signal on W Burnside Street at St. Clair Avenue.
SW 16th Ave and College St Sewer Project
Sewer and Stormwater
Active
Currently in design, construction is not anticipated to begin until spring of 2024.
Environmental Services is redesigning a project to repair public sewer pipe along SW 16th Avenue in the undeveloped right-of-way between SW College and SW Upper Hall streets and extending the sewer in SW College. This will help protect public health and the environment.
SW Jefferson Bus/Bike Lane Improvements
Transportation
Engineering And Design
May-June 2023
This project will improve transit and the bike lane on SW Jefferson between SW 16th and 18th avenues (Collins Circle).