Construction
82nd Avenue Critical Fixes: Beech and Ash Crossings
Transportation
Engineering And Design
Construction Begins summer of 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian safety improvements to 82nd Avenue at NE Beech Street and at SE Ash Street.

82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Engineering And Design
Construction Begins 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and Lambert streets.

82nd Avenue Critical Fixes: Street Lighting
Transportation
Engineering And Design
Construction Begins 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.

82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.

Critical Fixes
Transportation
Active
2021 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.

Mason/Skidmore Neighborhood Greenway Project
Transportation
In Planning
Coming in 2024
The Mason/Skidmore Greenway will be a new east-west neighborhood greenway connecting to existing north-south greenways at NE 37th Avenue, NE Cully Blvd, and NE 77th Avenue.
82nd Avenue Critical Fixes: Signing and Striping
Transportation
Engineering And Design
Winter 2022 - Spring 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including new street signs and high-visibility crosswalks at signalized intersections.

82nd Avenue Critical Fixes: Signal Timing Improvements
Transportation
Engineering And Design
Installation Began Winter 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including some minor signal technology upgrades, operations, and pedestrian and bicycle signal timing improvements.

Water Main Flushing Rose City Park, Roseway
Water Main Flushing
Active
Hydrant flushing is how Portland cleans the inside of its drinking water pipes and maintains excellent drinking water quality.

See something we could improve on this page? Give website feedback.