Construction
The Ellington
Rental
Open
Fall 2018
The Portland Housing Bureau purchased and renovated the Ellington, converting its 263 market-rate units to dedicated affordable housing for families in the Madison South neighborhood.

70s Neighborhood Greenway: NE Sacramento to SE Flavel
Transportation
Engineering And Design
Construction Spring 2023
The Portland Bureau of Transportation (PBOT) is constructing a new neighborhood greenway route between NE Sacramento and SE Flavel around the 70s avenues.

NE Halsey Street Safety and Access to Transit Project: NE 68th Ave to NE 92nd Ave
Transportation
Engineering And Design
Construction planned to begin 2023
The Portland Bureau of Transportation (PBOT) will construct safety improvements such as crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more along NE Halsey Street.

82nd Avenue Critical Fixes: Beech and Ash Crossings
Transportation
Engineering And Design
Construction Begins summer of 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian safety improvements to 82nd Avenue at NE Beech Street and at SE Ash Street.

82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Engineering And Design
Construction Begins 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and Lambert streets.

82nd Avenue Critical Fixes: Street Lighting
Transportation
Engineering And Design
Construction Begins 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.

82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.

Critical Fixes
Transportation
Active
2021 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.

82nd Avenue Critical Fixes: Signing and Striping
Transportation
Engineering And Design
Winter 2022 - Spring 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including new street signs and high-visibility crosswalks at signalized intersections.

Intersection Improvement Projects: Multiple Locations
Transportation
Upcoming
2023-2024
Upcoming crosswalk and ADA curb ramp improvement projects along Primary Investment Routes located within the Portland Public Schools (PPS) district. Funded by the 2012 PPS Bond.

82nd Avenue Critical Fixes: Signal Timing Improvements
Transportation
Engineering And Design
Installation Began Winter 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including some minor signal technology upgrades, operations, and pedestrian and bicycle signal timing improvements.

82nd Avenue Critical Fixes: Major Maintenance
Transportation
Engineering And Design
Construction 2024-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make urgent safety and maintenance improvements to 2.5 miles of NE 82nd Avenue from Fremont Street to Schuyler Street and SE 82nd Avenue from Mill Street to Foster Road.

See something we could improve on this page? Give website feedback.