Construction
The Ellington
Rental
Open
Fall 2018
The Portland Housing Bureau purchased and renovated the Ellington, converting its 263 market-rate units to dedicated affordable housing for families in the Madison South neighborhood.
70s Neighborhood Greenway: SE Flavel to NE Sacramento
Transportation
Under Construction
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
NE Halsey Street (68th to 92nd avenues) - Safety and Access to Transit Project
Transportation
Engineering And Design
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.
82nd Avenue Critical Fixes: Beech and Ash Crossings
Transportation
Under Construction
Construction 2023 - 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian safety improvements to 82nd Avenue at NE Beech Street and at SE Ash Street.
82nd Avenue Critical Fixes: Street Lighting
Transportation
Engineering And Design
Construction begins 2024
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.
82nd Avenue Critical Fixes
Transportation
Active
Multiple projects in construction 2022 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.
Safe Routes to School Intersection Improvements: Multiple Locations
Transportation
Upcoming
2023-2024
Upcoming crosswalk and ADA curb ramp improvement projects along Primary Investment Routes located within the Portland Public Schools (PPS) district. Funded by the 2012 PPS Bond.
Rose City Golf Course Trail Project
Parks
Upcoming
Design and Engineering - Fall 2023 to Summer 2024
This project will provide a new trail around the perimeter of the Rose City Golf Course and Rose City Park, improving existing trails.
NE Rocky Butte Rd and 92nd Ave Sewer Repair
Sewer and Stormwater
Active
Project design and investigations will continue through spring 2024. Construction may begin as soon as June 2024 and could take up to three months to complete.
Environmental Services is continuing to design a project to repair 1,157 feet of public sewer pipe that is in poor condition. These repairs will protect public health by reducing the risk of basement flooding and sewage releases to homes and streets.
82nd Avenue Critical Fixes: Major Maintenance
Transportation
Engineering And Design
Construction 2024-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make urgent safety and maintenance improvements to 2.5 miles of NE 82nd Avenue from Fremont Street to Schuyler Street and SE 82nd Avenue from Mill Street to Foster Road.
See something we could improve on this page? Give website feedback.