Construction
SE 150th and Division Street Park Master Plan
Parks
In Planning
The master plan for SE 150th and Division Street Park reflects a collaborative effort involving neighbors and community groups to create a welcoming space with activities for people of all ages.

4M Neighborhood Greenway: SE 130th Avenue to SE 174th Avenue
Transportation
Under Construction
Construction started in September 2022
The 4M Neighborhood Greenway will be constructed on SE Mill St., SE Millmain Dr., and SE Main St. between SE 130th Ave. and SE 174th Ave. It will create new opportunities for people to walk, bike, and roll on streets running parallel to the high-traffic SE Stark and SE Division corridors.

SE 162nd Ave Safety and Access to Transit Project: SE Stark Street to SE Powell Boulevard
Transportation
Under Construction
Construction summer 2022 to spring 2023
The Portland Bureau of Transportation (PBOT) is improving safety for people walking, taking transit, biking, and driving on SE 162nd Ave between SE Stark/Alder St and SE Powell Blvd. The safe crossings are being constructed as part of a partnership between TriMet and the City of Portland.

East Portland Access to Employment and Education: 4M, 100s, and 150s Neighborhood Greenways
Transportation
Under Construction
Construction December 2020-Oct 2023
The majority of this project has been completed. Sidewalks, street crossings, bikeway facilities, paved paths, and other safety improvements have been constructed on the 150s Neighborhood Greenway and the 100s Neighborhood Greenway. Work is ongoing for a portion of the 4M Neighborhood Greenway.

Parklane Park Project
Parks
Engineering And Design
Expected opening date: Fall 2024
Thanks to funding from System Development Charges, Parklane Park will be expanded from 5 acres to 25 acres.

Signalized School Route Crossings
Transportation
Upcoming
Construction begins Spring 2023
As part of a large signals package, PBOT and the Safe Routes to School program have designated five locations where contractors will build new pedestrian traffic signals and beacons. The five intersections are located on key school walking routes across Portland.
Parklane Park Local Improvement District
Transportation
Engineering And Design
Coming in 2024
This Local Improvement District (LID) will be constructed adjacent to Parklane Park. Portland Parks and Recreation (PP&R) will be using Parks System Development Charge (SDC) funds for their participation in the LID. This project will improve access to the park and build a multimodal path.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is planning to make safety improvements along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.

SE 174th Ave Sidewalk Infill: SE Main to Stark St
Transportation
Engineering And Design
Summer 2023
Construction crews will build a 10-foot concrete sidewalk with space for people walking and biking on the west side of SE 174th Ave between SE Stark St and Main St. New curb ramps and marked crosswalks will be installed, and street trees planted between the sidewalk and street.