Construction
Tryon-Stephens Neighborhood Street Improvement Project- SW Galeburn: SW Capitol Highway to SW 41st Ave Street Improvement Project
Transportation
Engineering And Design
Construction: Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland by paving gravel streets, adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
Tryon-Stephens Neighborhood Street Improvement Project- SW Capitol Hill Rd
Transportation
Engineering And Design
Construction: Late Winter/Early Spring 2025
PBOT will be improving several local streets in the Tryon Creek and Stephens Creek watersheds in southwest Portland as part of SW Tryon Stephens Transportation Infrastructure Charge (LTIC) by paving gravel streets, adding sidewalks or walkways, or a combination.
SW Capitol Highway Street Lighting
Transportation
Engineering And Design
Construction 2024 - 2025
This project will improve streetlighting on SW Capitol Highway and 49th from SW Barbur to Stephenson.
SW Ridge Neighborhood Greenway- SW 35th Drive to SW Taylors Ferry Road
Transportation
Engineering And Design
Construction set to be completed in summer 2024.
Design and implement a neighborhood greenway along SW Ridge Drive and SW Wilbard Street between SW 35th Drive and SW Taylors Ferry Road. Project by the Portland Bureau of Transportation (PBOT).
Advisory Shoulders & Bike Lanes 2023 Projects
Transportation
Upcoming
Construction in 2023 and 2024
PBOT is planning to install advisory shoulders lanes in three locations in Portland in 2023. Advisory shoulders and bike lanes are a low-cost, low-impact treatment for narrow streets with lower volumes of traffic and speeds.
Jamii Court
Rental
In Planning
Summer 2026
Community Partners for Affordable Housing (CPAH) will redevelop the Portland Value Inn, located in the West Portland Park neighborhood, to create a 96-unit multifamily redevelopment targeting families.
SW 45th Flower Pl. to Vermont St. Pavement Project
Transportation
Engineering And Design
Construction from August 2024 to December 2024
PBOT will place new Aspalt Concrete along SW 4th. Ave. from SW Vermont St. to SW Cameron Rd. This project will also include new pedestrian crossings, multi-use paths, ADA Ramps, roadway striping and new sidewalks.