Construction
Central Eastside Access and Circulation project
Transportation
Engineering And Design
Construction scheduled for 2023-2024
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding and modifying traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.
Anna Mann House
Rental
Under Construction
Spring 2023
Innovative Housing, Inc. is redeveloping the Anna Mann property to provide 128 affordable rental units in Kerns neighborhood, adjacent to Laurelhurst.

Buckman-Kerns Green Street and Sewer Project
Sewer and Stormwater
Active
Construction has started and will take up to three years to complete. Construction is anticipated to be complete in early 2026.
Environmental Services is constructing a project that will install and upsize public sewer pipes and construct green street planters in the Buckman and Kerns neighborhoods. These improvements will increase sewer capacity, relieve sewer backups, and help reduce street flooding.
Sandy Boulevard Sewer and Stormwater Project
Sewer and Stormwater
Active
Design will continue through late 2023. Construction is currently expected to begin in spring 2024 and take up to three years to complete.
Environmental Services is designing a project to install and upsize public sewer pipes within the Kerns Neighborhood and a small portion of the Buckman Neighborhood. These improvements will increase sewer capacity, relieve sewer backups, and reduce street flooding.
Grand Avenue Riser Stabilization Project
Sewer and Stormwater
Active
Project design will continue through May of 2023. Construction will occur in the fall of 2023 and take up to three months to complete.
Environmental Services is designing a project to stabilize soils at maintenance hole risers located along Grand Avenue. Soils are settling, requiring layers of asphalt to provide safe driving surfaces. This project will design a solution to stabilize soils and prevent settlement.
East Burnside Bus and Bike Lane Improvements
Transportation
Under Construction
Construction late 2022 - late 2023
This project will stripe a new bus and turn lane on E Burnside Street between MLK Blvd. and 12th Avenue. The project will provide faster, more reliable TriMet service.

NE/SE 7th Avenue Neighborhood Greenway & NE Couch Street Rose Lane Project
Transportation
Engineering And Design
Construction: Spring-Summer 2023
This Central City in Motion project will add a new neighborhood greenway connection along NE 7th Avenue between SE Washington Street to the Blumenauer Bridge. In 2022, the project also improved speed and reliability for westbound bus riders along NE Couch Street from NE 12th to 6th avenues.
See something we could improve on this page? Give website feedback.