Central Eastside Access and Circulation project
Transportation
Engineering And Design
Construction scheduled for 2023-2024
The Central Eastside Access and Circulation project will improve freight access and circulation and reduce multimodal conflicts in the Central Eastside by adding traffic signals, consistent with the adopted SE Quadrant Plan, Central City 2035 plan, and Central City in Motion.
Anna Mann House
Rental
Open
Summer 2023
Innovative Housing, Inc. is redeveloping the Anna Mann property to provide 128 affordable rental units in Kerns neighborhood, adjacent to Laurelhurst.

Buckman-Kerns Green Street and Sewer Project
Sewer and Stormwater
Active
Construction is underway and is anticipated to be complete in early 2026.
Environmental Services is constructing a project that will install and upsize public sewer pipes and construct green street planters in the Buckman and Kerns neighborhoods. These improvements will increase sewer capacity, relieve sewer backups, and help reduce street flooding.
Sandy Boulevard Sewer and Stormwater Project
Sewer and Stormwater
Active
Design will continue through late 2023. Construction is currently expected to begin in summer 2024 and take up to two years to complete.
Environmental Services is designing a project to install and upsize public sewer pipes within the Kerns Neighborhood and a small portion of the Buckman Neighborhood. These improvements will increase sewer capacity, relieve sewer backups, and reduce street flooding.
Grand Avenue Riser Stabilization Project
Sewer and Stormwater
Active
Project design continues. Construction is anticipated to begin in May of 2024 and be completed by the end of 2024.
Environmental Services is designing a project to stabilize soils at maintenance hole risers located along Grand Avenue. Soils are settling, requiring layers of asphalt to provide safe driving surfaces. This project will design a solution to stabilize soils and prevent settlement.