Construction
NE 122nd Ave Crossings Project
Transportation
Engineering And Design
Construction 2025-2026
The NE 122nd Ave Crossings project will provide four new and/or improved crossings to help meet crosswalk spacing guidelines and improve safety and access along NE 122nd Avenue.
122nd Avenue Plan: Safety, Access, Transit
Transportation
In Planning
The 122nd Avenue Plan identifies improvements to increase safety and improve access for all. Plan recommendations include changes to the street cross-section, additional enhanced crossings, lighting, signal changes, and more.
NE 105th and Marx Pump Station Project
Sewer and Stormwater
Active
The project is in the design phase. Construction is anticipated to begin in May 2025 and it will take about 18 months to complete.
Environmental Services is designing a project to upgrade and expand the aging pump station located at NE Marx Street and 105th Avenue in the Parkrose neighborhood. The project will modernize equipment, increase system capacity, and help protect public health and the environment.
Parkrose Neighborhood Greenway
Transportation
Closeout
Construction Spring 2024
The Portland Bureau of Transportation (PBOT) created the Parkrose Neighborhood Greenway to establish low-stress neighborhood streets that are great places to walk, bike, and roll. The greenway connects the Parkrose Neighborhood on NE 115th Ave and on NE Skidmore Street.
NE Shaver Sidewalk: NE 115th to Parkrose Middle School
Transportation
Under Construction
Began construction on July 8, 2024
Contractors will build sidewalk on the south side of NE Shaver Street between NE 115th Avenue and Parkrose Middle School campus. A total of seven new ADA ramps will be built at the corners of NE Shaver and 115th and 116th avenues.
NE Shaver Sidewalk: NE 102nd to NE 115th avenues
Transportation
In Planning
In design: Build in 2025
Construction crews will build sidewalk and new ADA curb ramps on the south side of NE Shaver Street to connect this key school route for Parkrose Middle and High School students.
NE 131st Place and Prescott Drive: Traffic Calming and Placemaking
Transportation
Engineering And Design
August - October 2024
The Portland Bureau of Transportation (PBOT) will oversee construction of traffic calming speed bumps on NE 131st Place between NE Shaver and Prescott Drive and a traffic circle at the intersection of Prescott Drive. Community-inspired street paintings will be installed along the project area.