Construction
Oak Leaf Mobile Home Park
Rental
Open
Spring 2019
St. Vincent de Paul has purchased the Oak Leaf Mobile Home Park to preserve 22 affordable homes in Cully.

NE Cully/Alderwood @ Columbia Boulevard Project
Transportation
Engineering And Design
Construction Summer 2024
The Portland Bureau of Transportation (PBOT) is building operational and safety enhancements at the intersections of NE Alderwood Road And Cully Blvd at Columbia Boulevard.

NE Cornfoot Road Corridor Improvements: NE 47th Avenue to NE Alderwood Road
Transportation
Engineering And Design
Construction Summer of 2023
This project will make improvements to NE Cornfoot Road from Airtrans to NE Alderwood Road.

60s Greenway: North of NE Klickitat Street
Transportation
In Planning
Construction 2023 or 2024
PBOT will add a new northern segment to the recently completed 70s Greenway that currently ends at NE Klickitat Street.
NE 42nd Ave Bridge over NE Lombard
Transportation
Engineering And Design
Construction fall of 2023
The Portland Bureau of Transportation is constructing a new earthquake-ready bridge to fill the gap between the Holman Neighborhood Greenway and the upcoming 47th Ave protected bikeway, while providing better access for freight, walking, and biking.

70s Greenway: Cully Connector
Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
Las Adelitas
Rental
Open
Fall 2022
Hacienda CDC constructed Las Adelitas, a new 142-unit multifamily project, in NE Portland’s Cully neighborhood.

Hayu Tilixam
Rental
Open
Fall 2022
Hayu Tilixam is Community Development Partners’ new 50-unit, affordable multifamily construction project in Cully.

Cully Neighborhood Street Improvement Project
Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will be improving several local streets in the Cully neighborhood by paving gravel streets, adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Engineering And Design
Construction Begins 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and Lambert streets.

82nd Avenue Critical Fixes: Street Lighting
Transportation
Engineering And Design
Construction Begins 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including improved street lighting between NE Lombard and SE Clatsop streets.

NE 46th Avenue & Bryant Street Local Improvement District
Transportation
Engineering And Design
Summer 2023 (Phase 1); Spring 2024 (Phase 2)
The Portland Bureau of Transportation (PBOT) is constructing Local Improvement District street improvements on NE 46th Avenue & Bryant Street.
82nd Avenue Civic Corridor Investment Strategy
Transportation
In Planning
2021 to 2027
After making the most critical repairs, PBOT will identify and prioritize future investments through the Civic Corridor Investment Strategy.

Critical Fixes
Transportation
Active
2021 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.

Columbia - Lombard Wayfinding Project
Transportation
Under Construction
Changes to addresses and street names will take effect on May 2, 2022
The Portland Bureau of Transportation (PBOT) has improved the confusing names of streets in the Columbia / Lombard Corridor in North and Northeast Portland.
Killingsworth Street Repaving and Safety Improvements
Transportation
In Planning
–
Portland Bureau of Transportation (PBOT) is working to repave and add safety improvements to Killingsworth Street from 53rd Avenue to Cully Boulevard by 2024.
Mejoras de seguridad y repavimentación de la calle Killingsworth
Transportación
En La Planificación
–
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard
Mason/Skidmore Neighborhood Greenway Project
Transportation
In Planning
Coming in 2024
The Mason/Skidmore Greenway will be a new east-west neighborhood greenway connecting to existing north-south greenways at NE 37th Avenue, NE Cully Blvd, and NE 77th Avenue.
82nd Avenue Critical Fixes: Signing and Striping
Transportation
Engineering And Design
Winter 2022 - Spring 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including new street signs and high-visibility crosswalks at signalized intersections.

82nd Avenue Critical Fixes: Signal Timing Improvements
Transportation
Engineering And Design
Installation Began Winter 2023
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including some minor signal technology upgrades, operations, and pedestrian and bicycle signal timing improvements.