Construction
NE 42nd Avenue Bridge Replacement (over Lombard Street)
Transportation
Engineering And Design
Construction in fall of 2024
The Portland Bureau of Transportation (PBOT) is constructing a new earthquake-ready bridge to provide better access for freight, pedestrians, and people biking. Bridge will fill the gap between the Holman Neighborhood Greenway and the upcoming NE 47th Avenue protected bikeway.
Safer Outer Stark
Transportation
Engineering And Design
–
The Portland Bureau of Transportation (PBOT) is actively working to improve safety for all modes along SE Stark Street between SE 108th Avenue and SE 162nd Avenue.
Buckman-Kerns Green Street and Sewer Project
Sewer and Stormwater
Active
Construction is ongoing and is anticipated to be complete in early 2026.
Environmental Services is constructing a project that will install and upsize public sewer pipes and construct green street planters in the Buckman and Kerns neighborhoods. These improvements will increase sewer capacity, relieve sewer backups, and help reduce street flooding.
82nd Avenue Critical Fixes: Klickitat to Lambert Crossings
Transportation
Under Construction
Construction 2023-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical pedestrian crossing improvements to 82nd Avenue at seven intersections between NE Klickitat and SE Lambert streets.
Citywide Sump Repair and Replacement
Sewer and Stormwater
Active
Construction began in April 2023 and will continue through April 2026. Check the webpage for regular project updates.
Environmental Services is removing aging sumps throughout the City and replacing them with new sumps and new sedimentation manholes. This work will help control stormwater runoff and sewer backups.
82nd Avenue Critical Fixes
Transportation
Active
Multiple projects in construction 2022 to 2026
PBOT is investing in 82nd Avenue to deliver critical fixes now. The needed urgent safety and maintenance repairs to the corridor include paving, crossings, lighting, safety improvements at intersections, and sidewalk improvements.
North River Sewer Repair Project
Sewer and Stormwater
Active
Construction is expected to start September 2024 and take about 6 months to complete.
Environmental Services is designing a project to replace deteriorating sewer pipe under North River Street between Albina and Interstate avenues. Taking these actions now reduce the possibility of costly breaks, leaks, blockages and sewage releases to buildings, streets, streams, and rivers.
hollywoodHUB
Rental
In Planning
Summer 2026
BRIDGE Housing will develop hollywoodHUB to add 222 units of affordable, transit-oriented housing for families and individuals in the Hollywood neighborhood.
SE 89th Avenue & Taylor Street Local Improvement District
Transportation
Engineering And Design
Late 2024
This Local Improvement District (LID) will construct street and sidewalk improvements on portions of SE Taylor Street and SE 89th Avenue next to Berrydale Park.
82nd Avenue Critical Fixes: Glisan and Davis Signal Improvements
Transportation
Engineering And Design
Construction 2025-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make critical safety improvements to 82nd Avenue, including rebuilding signals at NE 82nd Avenue at Glisan and Davis streets.
Columbia Slough Outfall 65 Stormwater Project
Sewer and Stormwater
Active
Construction is expected to begin in June 2024 and take about 5 months to complete.
Environmental Services is in the early stages of design on a stormwater management project in the northern portion of the Woodlawn neighborhood. This project is part of a larger effort to improve water and sediment quality in the Columbia Slough.
NE Multnomah and NE 19th Sewer Project
Sewer and Stormwater
Active
Construction is expected to begin June 2024 and take up to 5 months to complete.
Environmental Services is designing a project to upsize 223 feet of sewer pipe, replace four public sewer connections to private property, and add one new maintenance hole in the Sullivan's Gulch neighborhood. The project will reduce the possibility of sewage releases to buildings and streets.
NE MLK and Russell Sewer Project
Sewer and Stormwater
Active
Construction is expected to start in June 2024 and take about four months to complete.
Environmental Services is designing a project to upsize 583 feet of sewer pipe, replace 20 public sewer connections to private property, and add three new maintenance holes in the Eliot neighborhood. These improvements will reduce the possibility of sewage releases to buildings and streets.
82nd Avenue Critical Fixes: Major Maintenance
Transportation
Engineering And Design
Construction 2024-2026
As part of this project, the Portland Bureau of Transportation (PBOT) will make urgent safety and maintenance improvements to 2.5 miles of NE 82nd Avenue from Fremont Street to Schuyler Street and SE 82nd Avenue from Mill Street to Foster Road.
N Gantenbein Avenue Sewer Project
Sewer and Stormwater
Active
Design work is underway, and construction is anticipated to begin in Fall 2024.
Environmental Services is designing a project to replace the main sewer line on N Gantenbein Avenue. Sections of the pipe are over 120 years old and in deteriorating condition. This project will reduce the risks of basement sewer backups, flooding, and emergency repairs in the future.
Strong Family Site
Rental
In Planning
Winter 2026
Community Development Partners (CDP) and Self-Enhancement Inc. (SEI) will partner to develop rental units on the Strong property, prioritizing those on the N/NE Preference Policy waitlist. The nearby Abbey Lot will be developed concurrently into eight homeownership units.
Abbey Lot Townhomes
Home Ownership
In Planning
Winter 2026
On the corner of NE Alberta Street and NE Mallory Avenue, CDP and SEI will construct eight 3-bedroom, 2.5-bath permanently affordable townhomes with priority to families on the N/NE Preference Policy waitlist.
SE Stark & Washington Street Safety Project
Transportation
In Planning
–
A safety improvement project including travel lane reconfiguration, ADA upgrades, crossing enhancements, and enhanced bike lanes on Stark and Washington between 92nd and 106th. Design should occur in 2024 with construction in 2025-2026.
Beech Trunk Sewer Project
Sewer and Stormwater
Active
Construction is expected to start in Summer, 2024
Environmental Services is designing a project to repair large-diameter trunk sewer pipes near Interstate-5 and N Interstate Ave. This project will reduce the risks of basement sewer backups, flooding, and emergency repairs in the future.