21 projects found
Construction planned to begin summer 2024
The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more.

70s Greenway: Cully Connector

Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.
Summer 2024 (Phase 1); Spring 2025 (Phase 2)
This Local Improvement District (LID) will construct street, sidewalk, and stormwater improvements on portions of NE 97th Avenue and on E Burnside, NE Davis, and NE Couch streets.

Cully Neighborhood Street Improvement Project

Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.
Construction: Spring 2025
SW Galeburn Street Improvement Project will include paving gravel streets, installing stormwater facilities, and adding sidewalks or walkways, or a combination. Funding comes from the Local Transportation Infrastructure Charge (LTIC) and other sources.

NW Reed Drive Local Improvement District

Transportation
Engineering And Design
Summer 2024
This Local Improvement District (LID) will construct street improvements on NW Reed Drive west of NW 83rd Place to the western terminus of the right-of-way.
Design in 2023-2024 and Construction in Summer 2025
This intersection safety project will rebuild the signal at SE Flavel and SE 72nd to include dedicated left hand turns and will add additional illumination to the intersection. The project will also update corner ramps to current ADA standards and improve poor pavement conditions.

NE Killingsworth Safer Crossings Project

Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.

Rosa Parks & Greeley: Crossing & Signal, N

Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on N Rosa Parks Way at Greeley Avenue.

Foster Rd & 111th: Crossing & Signal, SE

Transportation
Engineering And Design
Spring 2025
This project will replace the traffic signal on SE Foster Road at 111th Avenue/Drive.