6 projects found

70s Greenway: Cully Connector

Transportation
Engineering And Design
Design 2021-2023, Construction begins 2024
The Portland Bureau of Transportation (PBOT) and Metro are partnering to make NE 72nd Avenue safe and comfortable for pedestrians and people biking by building a neighborhood greenway through the heart of the Cully and Roseway neighborhoods from NE Lombard Street and Sandy Boulevard.

Cully Neighborhood Street Improvement Project

Transportation
Engineering And Design
Design 2021-2023, Construction 2024
The Portland Bureau of Transportation (PBOT) will improve several streets in the Cully neighborhood by paving gravel streets, adding sidewalks, and traffic calming. The Bureau of Environmental Services (BES) and Portland Water Bureau (PWB) are project partners, upgrading area infrastructure.

NE Killingsworth Safer Crossings Project

Transportation
Engineering And Design
Construction in Summer 2024 and Summer 2025
PBOT will install nine safer crossings on NE Killingsworth including pedestrian islands and curb extensions. This project is in design and will construct the crossings in the summer of 2024 and summer 2025.