29 projects found
Construction of Phase 3 - Spring 2024
The Portland Bureau of Transportation (PBOT) is constructing safety improvements for pedestrians and people biking, taking transit, and driving on NE 102nd Ave between NE Weidler and NE Sandy.
Construction 2023-2024
PBOT is constructing a new neighborhood greenway route between SE Flavel Street and NE Sacramento Street around the '70s' numbered avenues.
Construction completed Spring 2024
The Portland Bureau of Transportation (PBOT) updated the street design of NE 148th Avenue from NE 146th Drive to NE Halsey Street. PBOT modified how space is allocated on NE 148th Avenue to reduce speeding and improve the street crossing at NE Sacramento Street.

NE 105th and Marx Pump Station Project

Sewer and Stormwater
Active
The project is in the design phase. Construction is anticipated to begin in fall 2025 and it will take about 18 months to complete.
Environmental Services is designing a project to upgrade and expand the aging pump station located at NE Marx Street and 105th Avenue in the Parkrose neighborhood. The project will modernize equipment, increase system capacity, and help protect public health and the environment.

NE 42nd Ave Infill: Killingsworth to Holman

Transportation
Engineering And Design
Construction late summer of fall of 2024
PBOT will be constructing sidewalks and ADA ramps on the east side of 42nd Avenue between NE Killingsworth Street and Holman Street.

Killingsworth Street Repaving and Safety Improvements

Transportation
Engineering And Design
Construction starts Summer 2024
Portland Bureau of Transportation (PBOT) will repave and add safety improvements to NE Killingsworth Street from 53rd Avenue to Cully Boulevard in the summer of 2024.
Alcance del Proyecto: la Calle NE Killingsworth desde Avenida 53rd hasta Cully Boulevard

Inverness System Planning Project

Sewer and Stormwater
In Planning
This project is in the planning phase. Planning and analysis will continue through the summer of 2024.
The Inverness pump station and force main system (The Inverness System) is nearing the end of its service life, and is in need of repair or replacement. This project will choose a preferred solution for repair and/or replacement that protects public health and the environment.

SE 155th Avenue & Main Street / Millmain Drive Local Improvement District

Transportation
Partially Open While Under Construction
Construction in April 2024
This Local Improvement District (LID) will be constructed adjacent to Parklane Park. Portland Parks and Recreation (PP&R) will be using Parks System Development Charge (SDC) funds for their participation in the LID. This project will improve access to the park and build a multimodal path.

Mason/Skidmore Neighborhood Greenway Project

Transportation
Engineering And Design
Coming in late summer 2024
The Mason/Skidmore Greenway will be a new east-west neighborhood greenway connecting to existing north-south greenways at NE 37th Avenue, NE Cully Blvd, and NE 77th Avenue.
Construction completed in spring/summer 2025.
The Portland Bureau of Transportation (PBOT) will be improving the walkability of NE Alameda St by installing ~250 ft of sidewalk, redesigning the intersection of NE 77th Ave, installing 8 new ramps, and marking new crosswalks as part of PBOT's Safe Routes to School.