Completed Construction
SW Multnomah Blvd Pedestrian/Bicycle Project
Transportation
Completed
Complete Fall 2014
The Portland Bureau of Transportation in partnership with the Bureau of Environmental Services is developing this project to improve pedestrian safety, bicycle safety, and stormwater management along SW Multnomah Blvd between Barbur Blvd and Multnomah Village.
50s Bikeway Project
Transportation
Completed
Complete Summer 2014
The 50s Bikeway Project, a 4.3 mile safety corridor along 52nd and 53rd avenues, improves connections to eight neighborhoods, including 12 schools and seven parks on Portland’s east side. The route filled in a major missing link within the city’s bicycle network.
Barbara Walker Crossing
Parks
Completed
Completed October 2019
Portland’s 30-mile Wildwood Trail once suffered a major flaw: its crossing at Burnside Road. With an average 18,000 vehicles passing daily, hikers were forced to dodge traffic in their pursuit of nature. The Barbara Walker Crossing now enhances access to nature by making this crossing safe.
NE 12th Avenue Crossing Improvement
Transportation
Completed
Complete
This projects solves a transportation bottleneck to provide non-motorized access between NE/SE Portland and Lloyd District.
NE Holladay Street Improvements
Transportation
Completed
Complete
This project provides comfortable and convenient non-motorized access to and through the Lloyd District, with a focus on the Rose Quarter, Convention Center, key businesses from the district, inner NE / SE, and from N Portland.
Vancouver/Wheeler Bikeway Access to Rose Quarter
Transportation
Completed
Complete
This project provides a safe, comfortable, and continuous bike facility on Vancouver Avenue from north of Broadway to the Rose Quarter.
SW 45th Avenue & California Street LID
Transportation
Completed
Assessment Completed September 2020
This completed local improvement district (LID) constructed new sidewalk along portions of SW Vermont Street, SW 45th Avenue and SW California Street, and a southbound bike lane along a portion of SW Vermont Street.
SE 122nd Ave Bridge over Johnson Creek
Transportation
Completed
Completed 2016
The Portland Bureau of Transportation (PBOT) built a replacement bridge after the 122nd Avenue Bridge was damaged by heavy rains during winter storms in December 2015.
LED Street Light Conversion Program
Transportation
Completed
2015-2016
During 2015 and 2016, the Bureau will convert the city’s 45,000 street lights to LED (light-emitting diode) lights.
Lloyd District Improvements - NE 15th/16th Avenues
Transportation
Completed
Complete Fall 2015
This project will construct crossing improvements across NE 15th/16th Avenue in the superblock between Halsey and Multnomah Streets.
3rd Avenue Reconfiguration Project
Transportation
Completed
Complete 2015
The community-endorsed plan will result in safer pedestrian crossings, a bicycle lane, reduced travel speeds for motor vehicles, and increased pedestrian space.
Gresham trestle upgrades
Capital Improvement Project
Closeout
Fall 2020 to spring 2021 (vegetation monitoring continues through 2024)
We have strengthened the structural supports (known as trestles) that hold a water pipe near Kelly Creek and Beaver Creek in Gresham. This project is part of our commitment to preparedness and our mission of serving excellent water every minute of every day.
Delta Park - Urban Forestry Facilities
Parks
Completed
Construction completed in Winter 2021/22
Thanks to the 2014 Parks Replacement Bond, improvements were made at the Urban Forestry Yard. The project included construction of a new covered and secure storage area for large equipment and an enclosed shop building.
122nd Avenue Area Safety Improvements
Transportation
Completed
Complete 2016
The Portland Bureau of Transportation (PBOT) installed three new rapid flashing beacon crossings and filled in sidewalk gaps in areas along 122nd Avenue between SE Foster Road and NE Sandy Boulevard to improve safety for travelers.
NW Naito Parkway Striping Project
Transportation
Completed
Complete 2016
NW Naito Parkway is undergoing a street design change to improve safety conditions for people walking and bicycling.
NE Glisan St Bridge Removal at NE 90th Ave
Transportation
Completed
Complete Fall 2016
The project will remove the existing bridge along NE Glisan St at NE 90th Ave and fill it with standard roadway materials.
2nd Avenue Reconfiguration Project
Transportation
Completed
Complete Fall 2016
The project will shorten crossing distances for pedestrians and provide a new northbound bicycling connection into Old Town from the existing bike lanes on Stark and Oak Streets.
SW Broadway Dr Retaining Wall Project
Transportation
Completed
Complete Summer 2016
This project replaces a distressed rubble retaining wall that supports a small portion of SW Broadway Drive.
N Willamette Blvd Retaining Wall Project
Transportation
Completed
Complete Summer 2016
This Project replaces the aging overhanging bridge structure that carries traffic along N Willamette Blvd between N Chase Ave and N Washburne Ave.
NE Sandy Blvd (47th Ave to 82nd Ave) Pavement Rehabilitation Project
Transportation
Completed
Complete 2016
This project provides pavement maintenance to a section of Sandy Blvd from 47th to 82nd Aves.