Completed Construction
SW 19th Avenue LID
Transportation
Completed
Complete 2004
This local improvement district (LID) includes street improvements to SW 19th Avenue.
NW 13th Avenue Phase II LID
Transportation
Completed
Complete Fall 2005
This local improvement district (LID) includes street improvements to NW 13th Avenue.
Royal Highlands Phase II LID
Transportation
Completed
–
This local improvement district (LID) includes sewer improvements to areas of Royal Blvd, Skyline Blvd, Manor Dr, and Winston Dr.
Burnside and Couch Concept Plan
Transportation
Completed
Adopted Apirl 11, 2007
The Burnside Concept Plan provides a long-term conceptual vision for Burnside Street. The plan includes recommendations for streetscape design, improvements for all modes of transportation, and an implementation strategy.
NW Thurman Street Bridge Project
Transportation
Completed
Complete Fall 2014
Given its age and condition, the Balch Gulch Bridge was in critical need of modernization and rehabilitation. Uneven wooden sidewalks caused pedestrians to trip and slip during soggy Portland days.
Barbara Walker Crossing
Parks
Completed
Completed October 2019
Portland’s 30-mile Wildwood Trail once suffered a major flaw: its crossing at Burnside Road. With an average 18,000 vehicles passing daily, hikers were forced to dodge traffic in their pursuit of nature. The Barbara Walker Crossing now enhances access to nature by making this crossing safe.
3rd Avenue Reconfiguration Project
Transportation
Completed
Complete 2015
The community-endorsed plan will result in safer pedestrian crossings, a bicycle lane, reduced travel speeds for motor vehicles, and increased pedestrian space.
NW Naito Parkway Striping Project
Transportation
Completed
Complete 2016
NW Naito Parkway is undergoing a street design change to improve safety conditions for people walking and bicycling.
2nd Avenue Reconfiguration Project
Transportation
Completed
Complete Fall 2016
The project will shorten crossing distances for pedestrians and provide a new northbound bicycling connection into Old Town from the existing bike lanes on Stark and Oak Streets.
SW Broadway Dr Retaining Wall Project
Transportation
Completed
Complete Summer 2016
This project replaces a distressed rubble retaining wall that supports a small portion of SW Broadway Drive.
Penridge Water Mains Replacement
Capital Improvement Project
Engineering And Design
Spring 2016 through Fall 2023
The Portland Water Bureau replaced the water mains (pipes) serving NW Penridge, Skyline Crest, and Greenleaf Roads in 2023. Larger pipes increase water flow to homes and hydrants.
Ned Flanders Crossing Bike and Pedestrian Bridge
Transportation
Completed
–
The bridge connects the Northwest District and the Pearl District with a safer and more comfortable crossing over I‐405.
Northwest in Motion
Transportation
Completed
The Portland Bureau of Transportation's (PBOT) Northwest in Motion Plan represents over two years of analysis, community outreach, and problem-solving to improve walking, biking, and public transit in the Northwest District and surrounding area.
Portland Open Space Sequence Restoration Project
Parks
Completed
Completed Summer 2019
The project includes historic restoration of Keller Fountain Park, Pettygrove Park, Lovejoy Fountain Park, and the Source Fountain. This project is in partnership with the Halprin Landscape Conservancy and funded by the Portland Open Space Sequence Local Improvement District and the City of Portland
SW Naito Parkway Improvement Project - I-405 to SW Jefferson
Transportation
Under Construction
Construction 2020-2022
The Portland Bureau of Transportation (PBOT) is paving SW Naito Parkway between I-405 and SW Lincoln and fully reconstructing the road between SW Harrison and SW Jefferson with safety and efficiency improvements for all travel modes.
Hillside Park Sports Field Renovation
Parks
Completed
–
Hillside Park’s grass athletic field will be closed from August 27, 2018, through March 1, 2019, while undergoing much-needed renovation.
NW Flanders Neighborhood Greenway Project
Transportation
Completed
Completed April 2021
This project improves conditions for people walking and biking on NW Flanders between Tom McCall Waterfront Park and NW 24th Avenue by upgrading crossings of busy streets and connecting new and existing bicycle and pedestrian infrastructure.
NW Everett Bus Lane Project
Transportation
Completed
Complete 2019
The NW Everett Bus Lane project improved transit reliability and access to the Rose Quarter by creating a Bus and Turn (BAT) lane approaching the Steel Bridge. This project was identified as a priority during the Central City in Motion planning process.
Burnside Bridge Bus/Bike Lane Project
Transportation
Completed
Complete 2019
This project created a new bus lane running eastbound across the Burnside Bridge starting at W 2nd Avenue and extending to 12th Avenue on the eastside.
SW Madison Bus/Bike Lane Project
Transportation
Completed
Complete 2019
The SW Madison Bus/Bike Lane project provides more reliable bus rides and more safety by bicyclists by creating a new bus and bike lane approaching the Hawthorne Bridge.
See something we could improve on this page? Give website feedback.