SW 45th Avenue & California Street LID
Transportation
Completed
Assessment Completed September 2020
This completed local improvement district (LID) constructed new sidewalk along portions of SW Vermont Street, SW 45th Avenue and SW California Street, and a southbound bike lane along a portion of SW Vermont Street.
Lincoln-Harrison Neighborhood Greenway Enhancement Project
Transportation
Completed
Construction to complete in 2020
The Portland Bureau of Transportation is making improvements to reduce cut-through car traffic, address high speeds, and create a low stress environment for people walking and biking on SE Ladd/Harrison/Lincoln between SE Clay and SE 60th.
Verdell Burdine Rutherford Park Playground Project
Parks
Completed
Completed Spring 2020
A new playground area, pathways, irrigation improvements, and other park amenities were added to Verdell Burdine Rutherford Park, thanks to funding from the Parks Replacement Bond and System Development Charges.
N Greeley Multi-Use Path and Paving Project
Transportation
Completed
Completed July 2020
The N Greeley Multi-Use Path is a two-way, one-mile path on the east side of N Greeley Avenue from N Going Street to N Interstate Avenue. The two-way bicycle and pedestrian facility is protected from vehicle traffic with continuous concrete barriers. N Greeley Avenue has also been repaved.
Creston Park Playground Project
Parks
Completed
Now open
Thanks to funding from the Parks Replacement Bond and a contribution from System Development Charges, outdated play structures have been replaced with safe and updated play equipment and rubberized safety surfacing at Creston Park's playground.
NE Columbia Boulevard at NE MLK Jr Boulevard Intersection Improvements
Transportation
Completed
Construction complete
The Portland Bureau of Transportation (PBOT) is improving safety and freight traffic movement through the intersection with a dedicated right turn lane and building new sidewalk.
NE MLK Jr Blvd Pedestrian Improvement Project
Transportation
Completed
Construction 2019-2020
The Portland Bureau of Transportation (PBOT) constructed two new places to cross Martin Luther King Jr. Blvd. at NE Graham and NE Sumner.
SW Capitol Highway Huber to Kerr Parkway Complete Streets Project
Transportation
Closeout
Construction 2020 and 2021
The Portland Bureau of Transportation (PBOT) made improvements to pedestrian crossings and access to transit in order to reduce crashes, reduce speeds, and enhance existing bike facilities on a High Crash Corridor.
SW Capitol Highway Improvements: Multnomah - Texas
Transportation
Completed
Construction completed June 2020
This project included repaving, updating existing curb ramps, and sewer repair on SW Capitol Highway between SW Multnomah and SW Texas streets.
East Portland Active Transportation to Transit Project (EPAT): 130s Neighborhood Greenway and SE Division 101st to 143rd Pedestrian Enhancements
Transportation
Completed
Project is complete
This project is constructing new sidewalks, ADA-accessible corner ramps, and signalized pedestrian crossings on SE Division Street between SE 101st and SE 143rd. It is also constructing the 130s Neighborhood Greenway between the I-84 multi-use path and the Springwater Corridor Trail.
Dates to be determined
PBOT will repave NE Alberta Street between 15th and 30th Avenues. Over 60 sidewalk corners will be rebuilt to create ADA-accessible curb ramps.
NE 42nd Ave: NE Wistaria Drive to NE Knott Street
Transportation
Completed
Construction January 2019 to June 2020
The Portland Bureau of Transportation (PBOT) repaved, improved speed deterrence systems, and updated curb ramps along NE 42nd Avenue between NE Wistaria Drive and NE Knott Street.
SW Multnomah Blvd / Garden Home Road Intersection Safety Project
Transportation
In Planning
Dates to be determined
Improving the intersection of SW Multnomah Boulevard, the Garden Home Road and 69th Avenue project seeks to reduce crashes, improve sight distance, address queueing issues, and provide safer, more comfortable pedestrian and bicycle facilities.
SE 80th and Mill LID
Transportation
Completed
Construction completed Fall 2020
This Local Improvement District project constructed street and sidewalk improvements to several blocks in the Mt. Tabor neighborhood.
NE 143rd and Sacramento Water Main Replacement
Water
Active
August 2019 to December 2020
The Water Bureau replaced 960 feet of an aging water main (pipe), installed three new hydrants, replaced one existing hydrant, and renewed sixteen service connections.
Roselawn Bundle Water Main Replacement
Water
Completed
August 2019 to July 2020
The Water Bureau replaced 4,001 feet (nearly a mile) of Cully neighborhood water pipes with more earthquake-resistant pipes.
Pittock Mansion Parking Plan
Parks
Active
–
Located just minutes from downtown Portland, Pittock’s beautiful natural setting, incredible overlook, historic Pittock Mansion, and the proximity to Forest Park make it a natural destination for hundreds of thousands visitors each year.
N Michigan Avenue Pavement Rehabilitation from N Fremont St to N Rosa Parks Way
Transportation
Under Construction
Summer or Fall 2020
The Portland Bureau of Transportation (PBOT) will microsurface the street as preventative maintenance and install upgraded ADA ramps along N Michigan Ave between N Fremont and N Rosa Parks Streets.
S Taylors Ferry Road Rockfall Protection Project
Transportation
Under Construction
Construction planned for June 15 - July 31 2020
This project will repair and protect the road from rockfall from the west slope of S Taylors Ferry Road just south of S Fulton Park Boulevard.
HOP Neighborhood Greenway: Gateway Transit Center to NE 128th Avenue on NE Holladay, Oregon and Pacific
Transportation
Completed
Complete Summer 2020
The Portland Bureau of Transportation (PBOT) is constructing a neighborhood greenway to link the I-205 Gateway area and NE 128th Avenue, providing a key connection between the 100s Neighborhood Greenway and the 130s Neighborhood Greenway.