Completed Construction
Barbara Walker Crossing
Parks
Completed
Completed October 2019
Portland’s 30-mile Wildwood Trail once suffered a major flaw: its crossing at Burnside Road. With an average 18,000 vehicles passing daily, hikers were forced to dodge traffic in their pursuit of nature. The Barbara Walker Crossing now enhances access to nature by making this crossing safe.
S Bond Avenue Extension
Transportation
Completed
Completed November 2019
This 0.3-mile segment of S Bond Avenue between Marquam Bridge and Tilikum Crossing was completed in 2019. The street was built to support development of the OHSU Schnitzer Campus. Future phases (not funded at this time) will form a north-south couplet with S Moody Avenue through South Waterfront.
Halsey-Weidler Streetscape Project: NE 102nd to 112th avenues
Transportation
Completed
Complete July 2019
A joint project of Prosper Portland and the Portland Bureau of Transportation, this project aimed to improve safety, operations, and access for people walking, biking, driving and taking transit.
Multnomah Arts Center Seismic and ADA Improvements
Parks
Completed
–
Multnomah Arts Center received seismic and ADA improvements through the Parks Replacement Bond.
SW 45th Bikelanes between SW Pendleton and SW Nevada
Transportation
Completed
Complete 2019
The Portland Bureau of Transportation (PBOT) reorganized the road to provide a bike lane between the Hayhurst neighborhood and the Southwest Community Center, Gabriel Park, and SW Vermont bike lanes. The project was funded by Fixing Our Streets.
Portland Open Space Sequence Restoration Project
Parks
Completed
Completed Summer 2019
The project includes historic restoration of Keller Fountain Park, Pettygrove Park, Lovejoy Fountain Park, and the Source Fountain. This project is in partnership with the Halprin Landscape Conservancy and funded by the Portland Open Space Sequence Local Improvement District and the City of Portland
NE Tillamook Neighborhood Greenway Enhancement Project (Phase 1): NE Flint to NE 28th
Transportation
Completed
Complete Summer 2019
The Tillamook Neighborhood Greenway Enhancement project is a series of safety and design changes between NE Flint and NE 28th that enhance an essential existing link in our low-stress walking and biking network.
Montavilla Community Center HVAC Project
Parks
Completed
–
Thanks to funding from the Parks Replacement Bond, Montavilla Community Center got a new roof and new heating/cooling units (HVAC).
Hillside Park Sports Field Renovation
Parks
Completed
–
Hillside Park’s grass athletic field will be closed from August 27, 2018, through March 1, 2019, while undergoing much-needed renovation.
Springwater Trail (Sellwood Gap) Trail Project
Parks
Completed
–
The Sellwood Gap (SE Umatilla to SE 13th Avenue) trail project will help close the gap between the Springwater on the Willamette Trail with the Springwater Corridor Trail by providing an off-street 12-foot path parallel to the Oregon Pacific mainline track from SE Umatilla to SE 13th Avenue.