(Title replaced by Ordinance 192002, effective January 10, 2025.)
This Title is known as Title 26, Electrical Regulations and will be referred to in this Title as “this Title.”
The purpose of this Title is to provide minimum standards to safeguard life or limb, health, property, and public welfare by regulating and controlling the design, construction, installation, quality of materials, location, operation and maintenance of all electrical systems within the City’s area of regulatory responsibility.
(Amended by Ordinance 192117, effective November 21, 2025.)
Except as otherwise provided in this code, theOregon Electrical Specialty Code(OESC) as adopted by OAR 918-305-0100 and amended by 918-305-0105 is adopted by this reference.
This Title will prevail except where specifically prohibited by the Oregon Revised Statutes and the Oregon Administrative Rules.
For the purpose of this Title, certain terms, phrases, words, and their derivatives must be construed as specified in this Chapter. Words used in the singular include the plural and the singular. Words used in the masculine gender include the feminine and the feminine the masculine. Terms, words, phrases and their derivatives used in this Title but not specifically defined in this Chapter have the meanings commonly accepted in the community.
Approved means electrical installations, equipment, product or materials acceptable under ORS 479 to the City, Portland Permitting & Development.
The Bureau means Portland Permitting & Development, which may be referred to in this Chapter as “the Bureau,” may be represented by any duly authorized employee.
Building Official means the building official for the City or a duly authorized representative charged with the administration and enforcement of the Electrical Code. The Building Official serves as the authority having jurisdiction over the Electrical Code.
The Electrical Code means the current State of Oregon Electrical Specialty Code, (including appendices and Electrical Standards) as adopted by the State of Oregon.
Electrical Inspection Supervisor means the supervisor of Portland Permitting & Development's Commercial Electrical Section.
Emergency electrical work is an acute, unplanned and immediate need for electrical repair or replacement involving an existing electrical installation or product or both.
Inspector means a person certified by the State of Oregon as competent in electrical code regulation and employed by the Bureau.
Owner is the person whose name and address is listed as the owner of the property by the County Tax Assessor on the County Assessment and Taxation records.
Supervising Electrician is a person possessing a valid general or limited supervising electrician’s license issued by the State of Oregon.
Unanticipated electrical work is electrical work, including a new installation, requested by a customer where the timing of a request for commencement of work does not reasonably allow the contractor time to obtain an electrical permit before starting the work. Unanticipated electrical work includes, but is not limited to, additional work assigned at the work site as well as preassigned work when the customer requests service at an unplanned date or time. Unanticipated electrical work does not include electrical work where a permit already exists covering all or part of the work.
The City Administrator is responsible for the enforcement of this Title except to the extent the Building Code, as that term is defined in Subsection 24.10.075 A.1., empowers and requires the Building Official to act. The City Administrator appoints technical officers, certified inspectors and other employees necessary to enforce this Title. The City Administrator may render interpretations of this Title and the Electrical Code and adopt and enforce supplemental regulations in order to clarify the application of requirements. Such interpretations, rules and regulations will be in conformance with the intent and purpose of the Electrical Code.
The City Administrator may enter and inspect any building or premises when:
The City Administrator may inspect occupied buildings or premises at reasonable times by presenting credentials to the occupant(s) and requesting entry. To request entry to and inspect unoccupied buildings or premises, the City Administrator will first make a reasonable effort to locate the owner or other persons controlling the property. If entry is refused or if the owner or persons controlling the property cannot be located, the City Administrator will have recourse to the remedies provided by law to secure entry.
Any electrical equipment, product or material used or intended to be used under the scope this Title must be approved under ORS Chapter 479. To be accepted by the Bureau, such equipment, product or material must be installed, constructed, altered, renovated, repaired and maintained in compliance with the requirements of this Title.
Nothing in this Title is intended to permit the design, construction, installation, quality of materials, location, operation and maintenance of equipment that is not in accordance with any applicable sections of Title 24 (Building Regulations), Title 25 (Plumbing Regulations), Title 27 (Heating and Ventilating Regulations), Title 28 (Floating Structures) and Title 32 (Signs and Awnings) of this Code.
Any portion of any installation, construction, alteration, renovation, or repair made in violation of this Title must be removed or corrected to comply with the requirements of this Title.
Whenever there is insufficient evidence of compliance with any of the requirements of this Title or evidence that any equipment, product, material or construction does not conform to the requirements of this Title, the City Administrator may require tests as proof of compliance. All tests must be made by an agency approved by the State of Oregon Electrical and Elevator Board as meeting the testing standard requirements for electrical safety as required by ORS 479.510 through 479.855 and Oregon Administrative Rules. The tests must be made at no expense to the City. Test methods must be as specified by the Electrical Code or by other recognized test standards. If there are no recognized and accepted test methods for the proposed equipment, product, material, or construction, the City Administrator may determine test procedures. Reports of such tests will be retained by the City for the period required for the retention of public records.
Any person, other than the owner, performing any electrical work regulated by this Title must possess appropriate State of Oregon electrical license(s) and/or registration(s) indicating qualifications appropriate to the type of work involved. If requested, the required licenses and registrations must be shown to the City Administrator.
If any provision of this Title, or its application to any person or circumstance, is held invalid by any court, the remainder of this Title and its application to other persons and circumstances, other than that which has been held invalid, will not be affected by such invalidity, and to that extent the provisions of this Title are declared to be severable.
When it is necessary to obtain compliance with this Title, the City Administrator may issue a stop work order requiring that all work, except work directly related to elimination of the violation, be immediately and completely stopped. If the City Administrator issues a stop work order, activity subject to the order may not be resumed until such time as the City Administrator gives specific approval in writing. The stop work order will be in writing, except when an emergency condition exists, the City Administrator may issue a stop work order orally, followed by a written stop work order. All stop work orders will conform to the requirements of Portland City Code Section 3.30.080. Any person subject to a stop work order may seek review of the order by the City Administrator and may appeal the City Administrator’s determination in accordance with Portland City Code Section 3.30.080.
All existing electrical installations must be maintained in a safe condition. All required devices or safeguards must be maintained in conformance with the Electrical Code and this Title. To determine compliance with this Section, the City Administrator may inspect any electrical installation.
The City Administrator, acting in good faith and without malice in the discharge of the duties required by this Title, will not be rendered personally liable for any damage that may occur to persons or property as a result of any act or by reasons of any act or omission in the discharge of such duties. Any suit brought against the City Administrator because of such act in the scope of their duties or omission performed by them in the enforcement of any provision of this Title or other pertinent laws or ordinances implemented and enforced by the City will be defended by the City until final termination of such proceedings, and any judgement resulting therefrom will be assumed by the City.
This Title may not be construed to relieve from or lessen the responsibility of any person owning, operating or controlling any electrical installation equipment or product for any damages to persons or property caused by defects, nor will the Bureau or City be held as assuming any such liability by reason of the inspections authorized by this Title or any permits or certificates issued under this Title.
Applications for electrical permits must be made on forms furnished by the Bureau. For one- and two-family dwellings, the electrical subcontractor inspection sticker will be considered part of the application form. The applicant must provide all information required in a complete and legible manner. The application must be signed by the appropriate person as required by OAR. Permit fees and/or plan review fees must be paid at the time of application. Failure to properly complete the permit application may result in a delay or prevention of permit issuance until required information has been submitted.
Exception:Any jurisdiction’s electrical permit application may be used for temporary permits (see Section 26.04.070) as long as fees are paid in accordance with Title 26.
A permit to perform electrical work in or about a residential or farm building may be issued to the owner of that building, subject to the following conditions:
When the City Administrator finds that the work described in the permit application, plans and specifications and other data filed therewith conforms to all requirements of this Title, that the electrical permit application has been signed as required, and that the specified fees have been paid, the City Administrator may issue an electrical permit to the applicant. All permits issued will be subject to the following conditions:
The permit for an electrical installation requiring plan review will not be issued, nor may work proceed, until the plans are approved by an electrical plan examiner. However, the City Administrator may authorize the issuance of a partial permit before the entire plans and specifications are submitted or approved. Adequate information must be submitted showing the areas of work to be covered by the partial permit and compliance with pertinent portions of the Electrical Code. Applicants will be notified in writing of which portions of the work may proceed and of the conditions under which work may proceed. Issuance of a partial permit, or authorization to commence an installation, will not constitute assurance to the applicant that a permit on the entire installation will be issued, or that corrections will not be required on the portions of the installation granted preliminary authorization.
The City Administrator may issue temporary permits for emergency electrical work or unanticipated electrical work as those terms are defined in and pursuant to OAR 918-309-0080, provided all of the requirements in OAR 918-309-0080 are met. Temporary permits will only be issued to licensed electrical contractors. Temporary permits are valid for seven days.
When work is done under a temporary permit, the permit application and fees must either be received by the Bureau within seven calendar days of the start of work, or, if mailed, be postmarked within seven calendar days of the start of work.
The City Administrator may, in writing, suspend or revoke a permit issued under requirements of this Title whenever the permit is issued in error, or on the basis of incorrect information supplied, or in violation of any law, ordinance, or requirement of this Title.
All required fees are stated in the Fee Schedule adopted by City Council. Fees will be updated annually or on an as needed basis. The approved Fee Schedule will be available at the Development Services Center.
When permit or plan review fees were paid incorrectly due to an error on the part of the City, permit and plan check fees will, as a general rule, be refunded in full when the services covered by the fees have not commenced. When a permit applicant requests a refund, but the City was not at fault in accepting payment, fees will be retained to cover the cost of plan review or inspections actually performed and 20 percent of the amount remaining. State surcharge fees are only refundable when a permit was issued in error. Refund requests must be made within six months of payment or permit issuance, whichever is later. Refunds will be made to the same person or firm who paid the fee. Fees will be refunded within three months of receipt of the refund request. Exceptions to the above requirements may be made by the City Administrator.
All electrical installations requiring an electrical permit are subject to inspection. Work may not be covered prior to inspection. The City Administrator may inspect electrical installations at such times deemed necessary to obtain compliance with the Electrical Code and this Title in accordance with OAR 918-271.
In addition to the required inspections specified in Section 26.06.010, the City Administrator may make or require other inspections of any electrical installation to ascertain compliance with the Electrical Code and this Title.
Inspectors inspect electrical installations and provide public information on the meanings or applications of Electrical Code provisions, but do not lay out work or act as consultants for electrical contractors, property owners or users.
It is the responsibility of the person doing the work authorized by the permit to notify the Bureau when the work is ready for inspection. A person requesting an inspection must ensure access and means for the Bureau to perform the required inspection. The City will not be liable for expenses incurred in removing or replacing any material required to conduct any inspection.
Connecting electrical installations to an electrical supply source may be done only after approval by the City Administrator. Such inspection approval is identified by the City’s Electrical Inspection Record initialed by the City Administrator and posted on the panel box or other conspicuous place.
Exceptions: An electrical installation under this Title may be legally energized prior to inspection provided:
When a building has been vacant and the power has been off for six months, the City Administrator will inspect the building prior to reconnection of power. A reconnection permit fee must be paid prior to the inspection.
Electrical products intended for use within the City must meet the requirements of this Title even when fabricated in another jurisdiction. The City Administrator may require in-plant or on-site inspection of the fabricating process to ensure acceptability of the finished fabrication for use within the City.
Such in-plant or on-site inspection costs as determined by the City Administrator must be paid by the product fabricator prior to Bureau authorization for product use within the City.
The Bureau will conduct an Electrical Master Permit (Industrial Plant) Program as identified in OAR 918-309-0100. This program will regulate repair, alteration or replacement of existing electrical products in qualified facilities and electrical installations that are part of a tenant remodel or construction within a covered facility involving a mechanical, plumbing or structural master permit. Electrical product replacement includes installing a product in place of another that does not exceed the capacity or design of the existing electrical system. The following types of facilities are allowed to be registered for the Master Permit (Industrial Plant) Program:
Applicants for registration in the Electrical Master Permit (Industrial Plant) Program must be the owner, building operations manager or electrical contractor responsible for all electrical installations in the facility. Each registration must be limited to a single facility, which may be more than one building in a complex of buildings. Applicants with multiple facility locations on noncontiguous lots must obtain a registration for each facility.
An application for a registration must be made on the form furnished by the Bureau. The applicant must provide all information required in a complete and legible manner. Registration fees must be paid at the time of application.
Electrical work may not be done beyond the scope of the license held. Applicants with Limited Maintenance Electricians or Limited Building Maintenance Electricians on staff are not required to hold an Electrical Contractor’s License or to employ a Supervising Electrician for work within the scope of these limited license categories. Before registration will be granted, applicants must either:
When a facility is registered in the Electrical Master Permit (Industrial Plant) Program, no separate permit is required for repair, alteration or replacement of existing electrical products. Any electrical work not covered by the Electrical Master Permit (Industrial Plant) Program requires the completion and submission of an electrical permit application to the Bureau prior to performing such work. Any installation outside the scope of the Electrical Master Permit (Industrial Plant) Program must be installed by appropriately licensed electricians and must be inspected by the City Administrator.
If any registrant refuses or neglects to comply with the requirements of this Title or a related regulation (all regulations pertaining to building construction, remodeling or alteration are related regulations) within 30 calendar days after the Bureau has sent the written correction notice, the Bureau may suspend or terminate the registration. In addition, the penalty provided for in this Title may be enforced, and all work must be corrected and made to comply with the requirements of this Title. A new registration will not be issued or suspension lifted until all violations cited have been corrected.
If the Bureau orders the suspension or termination of a Master Permit (Industrial Plant) registration, the registrant aggrieved may appeal, in writing, to the Electrical Board of Appeal within 15 calendar days after such order. The registrant will be given not less than 15 calendar days’ notice of the hearing. The Board will proceed to hear and determine the appeal. Any suspension of a registration by the Electrical Board of Appeal may be on such conditions as the Board may order. In all cases, decisions of the Board are final.
ORS 455.155 gives the Department of Consumer and Business Services the authority to create a statewide permit and inspection system for minor construction work. The Oregon Building Codes Division under the Department of Consumer and Business Services has created a statewide minor labels program. Implementation rules are found in Oregon Administrative Rules 918-100-000 through 918-100-060. The Bureau will operate the Minor Electrical Label Program in accordance with the Oregon Administrative Rules. The Minor Installation Label Program utilizes minor labels in lieu of regular electrical permits.
Minor Electrical Labels may be used in all occupancies (including commercial, industrial, apartment, multi-family and one- and two- family residence installations). As provided by Oregon law, the Tri-County Service Center sells minor electrical labels. The Bureau will refer all requests for minor electrical labels to the Tri-County Service Center.
The Building Official, in accordance with Oregon Administrative Rule 918-100-0060, will conduct inspections and issue necessary correction notices for labels issued by the Tri-County Service Center.
It is unlawful to violate the requirements of this section. Any violation of this section may be sanctioned by application of the remedies provided in Portland City Code Section 3.30.040.
No person, firm, or corporation may sell, transfer or otherwise dispose of any electrical product, material or device that is used or intended to be used in the installations regulated by this Title, unless such product, material or device has been certified or listed as per ORS 479.760.
Some products are exempted from certification by ORS 479.540. The Bureau will inspect the installation of any exempt product to ensure that Electrical Code requirements are met.
(Chapter added by Ordinance 192211, effective August 29, 2026.)
The following definitions apply:
When the City funds, in whole or in part, the installation of an electric vehicle charging system to be located on the customer's side of the meter, it will require as a condition of the funding that:
In addition to the requirements under Section 26.11.020, when the installation is for an electric vehicle charging system to be located on the customer's side of the meter that will supply 25 or more kilowatts to an electric vehicle, the City will require that at least 25 percent of electricians who are present and working on the installation hold Electric Vehicle Infrastructure Training Program or equivalent training program certifications.
The requirements of this Chapter 26.11 do not apply to the installation of an electric vehicle charging system for a single-family dwelling, townhouse or multifamily residential building with four or fewer residential units.