important alert
State closes I-5 southbound at Rose Quarter for 5 weeks starting Sept. 11

Plan for major delays. More at i5rosequarter.org. Visit Shift Your Trip to keep Portland moving.

informational alert
Portland is a Sanctuary City

26.08.020 Application Requirements.

Label: City code section

Applicants for registration in the Electrical Master Permit (Industrial Plant) Program must be the owner, building operations manager or electrical contractor responsible for all electrical installations in the facility. Each registration must be limited to a single facility, which may be more than one building in a complex of buildings. Applicants with multiple facility locations on noncontiguous lots must obtain a registration for each facility.

Back to top