City Code Section
- A. Separate meters are required to supply water to:
- 1. Each separate lot, parcel, house or building under separate ownership;
- 2. Buildings on multiple contiguous lots under the same ownership;
- 3. New mixed-use buildings will be required to have a separate commercial meter;
- 4. New non-residential developments which will include irrigation of 1,000 square ft or greater will be required to install a separate irrigation meter.
- B. Separate meters may be installed to supply water to:
- 1. New accessory dwelling units (ADU’s);
- 2. New residential and multifamily developments with more than one unit;
- 3. Developments that are required to up-size their meter; or,
- 4. Other developments approved by the Chief Engineer.
- Effective Date. This Subsection will go into effect on July 1, 2021.