Chapter 17.106 Deconstruction of Buildings Law

City Code Chapter

17.106.010 Purpose.

This Chapter provides deconstruction requirements for the removal of Portland’s older and more historic primary dwelling structures. The Deconstruction of Buildings Law seeks to:

  1. A. Maximize the salvage of valuable building materials for reuse;
  2. B. Reduce carbon emissions associated with demolition;
  3. C. Reduce the amount of demolition waste disposed of in landfills; and
  4. D. Minimize the adverse impacts associated with building removal.

17.106.020 Definitions.

The terms used in Chapter 17.106 are defined as provided in this Section:

  1. A. Certified Deconstruction Contractor means a contractor licensed with the Oregon Construction Contractors Board (CCB) that has successfully completed a deconstruction certification program recognized by the Bureau of Planning and Sustainability. A firm will be considered certified if at least one person currently employed by the firm is certified.
  2. B. Deconstruction means the systematic dismantling of a structure, typically in the opposite order it was constructed, in order to maximize the salvage of materials for reuse, in preference over salvaging materials for recycling, energy recovery, or sending the materials to the landfill.
  3. C. Director means the Director of the Bureau of Planning and Sustainability or their authorized designee.
  4. D. Primary dwelling structure means one and two-family structures (detached and attached) based on current permitted occupancy at the time of demolition permit application. Primary dwelling structures do not include accessory structures such as garages or accessory dwelling units.
  5. E. Recycling means the processing of waste materials into new products or material feed stock for products. Materials that can be recycled include but are not limited to concrete, metal piping, and asphalt roofing shingles.
  6. F. Responsible party means any owner or person in control of a primary dwelling structure, or their authorized agent.
  7. G. Reuse means the utilization of a product or material that was previously installed for the same or similar function to extend its life cycle. Materials salvageable for reuse include but are not limited to cabinets, doors, hardware, fixtures, flooring, siding, and framing lumber.

17.106.040 Regulations.

  1. A. Scope. The deconstruction requirements of this Chapter apply to demolition permit applications under Chapter 24.55 of Portland City Code for:
    1. 1. Primary dwelling structures that were built in 1940 or earlier according to building permit records on file with the Portland Permitting & Development, or if no such permit records exist, then County tax assessor information; or
    2. 2. Primary dwelling structures that have been designated as a historic resource subject to the demolition review or 120-day delay provisions of Portland City Code Title 33.
  2. B. Requirements. Primary dwelling structures must be deconstructed in accordance with the provisions of this Chapter and associated administrative rules. Salvaged material may be sold, donated, or reused on site.
    1. 1. Demolition permit application. An application for a demolition permit under Portland City Code Chapter 24.55 for any primary dwelling structure will not be considered complete unless it is accompanied by a completed Pre-Deconstruction Form provided by the City Administrator.
    2. 2. Certified Deconstruction Contractor. Deconstruction work must be performed by a Certified Deconstruction Contractor. A Certified Deconstruction Contractor must be assigned to the project throughout the course of deconstruction. Certified Deconstruction Contractors must comply with the requirements of this Chapter and the administrative rules. The Bureau of Planning and Sustainability will maintain on file and available to the public a list of current Certified Deconstruction Contractors.
    3. 3. Site posting. On the first day of active deconstruction a yard sign provided by the City Administrator when the permit is issued must be posted at the site. The sign must indicate that the structure is being deconstructed and must provide City contact information for questions or concerns.
      1. a. The sign must remain in place throughout the course of deconstruction.
      2. b. The sign must be placed on each street frontage of the site.
      3. c. Signs must be posted within five feet of a street lot line and must be visible to pedestrians and motorists. Signs may not be posted in a public right-of-way. Signs are not required along street frontages that are not improved and allow no motor vehicle access.
    4. 4. Heavy machinery. Heavy machinery may be used in deconstruction to assist in the salvage of materials for reuse or to remove material not required to be salvaged for reuse. Heavy machinery may not be used in deconstruction to remove or dismantle components of buildings in ways that render building components unsuitable for salvage. For purposes of this Chapter 17.106, heavy machinery includes, but is not limited to, track hoes, excavators, skid steer loaders, or forklifts.
    5. 5. Documentation. Certified Deconstruction Contractors must maintain receipts for donation, sale, recycling, and disposal of all materials for any deconstruction project. Materials intended for reuse on site must be documented with photographs. The City Administrator may ask that a Certified Deconstruction Contractor produce the receipts or photographs for inspection any time until the demolition permit is approved to be finaled.
    6. 6. Demolition permit final. A completed Post-Deconstruction Form and all documentation required in Subsection 5. above must be submitted to the Bureau of Planning and Sustainability before the Portland Permitting & Development may approve a demolition permit as finaled.
  3. C. Additional regulations. Compliance with Chapter 17.106 does not exempt the demolition of buildings from any other requirements of Portland City Code, such as in Title 11 Trees, Title 24 Building Regulations, or Title 33 Planning and Zoning.
  4. D. Exemptions. The following are exempt from the requirements of Chapter 17.106:
    1. 1. A building permit to move a structure as provided under Portland City Code Chapter 24.25.
    2. 2. Any primary dwelling structure that has been determined by the Portland Permitting & Development to be dangerous and is required to be abated by demolition as provided in Portland City Code Section 29.40.030.
    3. 3. Any primary dwelling structure that the City Administrator has determined is unsuitable for deconstruction because:
      1. a. The structure is structurally unsafe or is otherwise hazardous to human life; or
      2. b. Most of the material in the structure is not suitable for reuse.
  5. E. Request for an exemption. An applicant may request an exemption from the requirements of this Chapter under Subsection 17.106.040 D.3. above by submitting a written request for exemption, together with supporting evidence, when submitting a demolition permit application.
  6. F. Determination of an exemption. The City Administrator will make the final determination of exemption based on evidence submitted by the applicant as well as an inspection to confirm conditions and unsuitability. The demolition permit will not be issued until the final determination is made on the exemption request. Should the applicant disagree with the final determination the determination may be appealed by the applicant under Subsection 17.106.060 B.

17.106.050 Enforcement and Penalties.

  1. A. The City Administrator may impose penalties on any responsible party who fails to comply with the requirements of this Chapter or who has misrepresented any material fact in a document or evidence required to be prepared or submitted by this Chapter.
    1. 1. A first violation of this Chapter may be subject to a penalty of up to $500.
    2. 2. A second violation of this Chapter by the same person may be subject to a penalty of up to $1,000.
    3. 3. Third and subsequent violations of this Chapter by the same person may be subject to a penalty of up to $1,500.
    4. 4. Penalties may be imposed on a per month, per day, per incident, or such other basis as the City Administrator may determine as appropriate based upon criteria in Subsection E. below.
    5. 5. Any person receiving a notice of violation must, within 10 days of issuance of the notice, either pay to the City the stated amount of the penalty or request an appeal as provided in Section 17.106.060.
  2. B. Heavy machinery.
    1. 1. Improper use of heavy machinery in violation of this Chapter may be subject to a penalty of up to $10,000.
    2. 2. Any person receiving a notice of violation must, within 10 days of issuance of the notice, either pay to the City the stated amount of the penalty or request an appeal as provided in Section 17.106.060.
  3. C. Additional enforcement actions for Certified Deconstruction Contractors. The City Administrator may impose the following additional remedies for Certified Deconstruction Contractors.
    1. 1. A first violation of this Chapter may result in removal from the list of approved Certified Deconstruction Contractors for up to six months.
    2. 2. A second violation of this Chapter may result in removal from the list of approved Certified Deconstruction Contractors for up to 12 months.
    3. 3. Third and subsequent violations may result in revocation of certification, after which a contractor may not apply for recertification for a period of 18 months.
    4. 4. Temporary removal from the list of approved Certified Deconstruction Contractors will expire immediately following the term of removal and will not require further action from the City Administrator.
  4. D. Stop work orders. When necessary to obtain compliance with this Chapter, the City Administrator may issue a stop work order requiring that all work, except work directly related to elimination of the violation, be immediately and completely stopped. If the City Administrator issues a stop work order, activity subject to the order may not be resumed until such time as the City Administrator gives specific approval in writing. The stop work order will be in writing and posted at a conspicuous location at the site. When an emergency condition exists, a stop work order may be issued orally, followed by a written stop work order. It is unlawful for any person to remove, obscure, mutilate or otherwise damage a stop work order. Any person subject to a stop work order may seek administrative review of the order and may appeal the City Administrator’s administrative determination as provided in Subsection 17.106.060 B.
  5. E. The City Administrator will consider the following criteria in determining the amount of penalties or remedies to impose under this Section:
    1. 1. The nature and extent of the person’s involvement in the violation;
    2. 2. Whether the person was seeking any benefits, economic or otherwise, through the violation;
    3. 3. Whether other similar prior violations have occurred with that person;
    4. 4. Whether the violation was isolated and temporary, or repeated and continuous;
    5. 5. The length of time from any prior violations;
    6. 6. The magnitude and seriousness of the violation;
    7. 7. The costs of investigation and remedying the violation;
    8. 8. Other relevant, applicable evidence bearing on the nature and seriousness of the violation.
  6. F. If the City Administrator assesses an enforcement penalty as described in this Section against a property owner, the revenue service and program of the City Administrator may file a statement that identifies the property, the amount of the penalty, and the date from which the charges are to begin. The revenue service and program of the City Administrator will then:
    1. 1. Notify the property owner of the assessment of enforcement penalties;
    2. 2. Record a property lien in the docket of City liens;
    3. 3. Bill the property owner monthly for the full amount of enforcement penalties owing, plus additional charges to cover the City’s administrative costs; and
    4. 4. Maintain lien records until the lien and all associated interest, penalties, and costs are paid in full; and the City Administrator certifies that all violations listed in the original or any subsequent notice of violation have been corrected.
  7. G. Inspections. The City Administrator may conduct inspections whenever necessary to enforce any provisions of this Chapter, to determine compliance with this Chapter or whenever the City Administrator has reasonable cause to believe there exists any violation of this Chapter. If the responsible party is at the site when the inspection is occurring, the City Administrator will first present proper credentials to the responsible party and request entry.

17.106.060 Right of Appeal.

  1. A. Whenever the responsible party has been given a written notice or order pursuant to this Chapter or has been directed to make any correction, pay a penalty or to perform any act and the responsible party believes the finding of the notice or order was in error, the responsible party may have the notice or order reviewed by the City Administrator. If a review is sought, the responsible party must submit a written request to the City Administrator within 10 days of the date of the notice or order. Such review will be conducted by the City Administrator. The responsible party requesting such review will be given the opportunity to present evidence to the City Administrator. Following a review, the City Administrator will issue a written determination. Nothing in this Section limits the authority of the City Administrator to initiate a code enforcement proceeding under Portland City Code Title 22.
  2. B. A responsible party may appeal the City Administrator’s written determination to the Code Hearings Officer in accordance with Portland City Code Chapter 22.10. The filing of an appeal request will remain the effective date of a penalty until the appeal is determined by the Code Hearings Officer. If, pursuant to said appeal hearing, payment of a penalty is ordered, such payment must be received by the City Administrator or postmarked within 15 calendar days after the order becomes final.