SW Market-Madison Sewer Project Map (Description)

The project extends north to SW Salmon Street, south to SW Market Street, east to the river, and west to SW 13th Avenue. Pipe work will occur at the following locations, and the construction method is listed after each segment:

  • SW Market Street between SW 13th and SW Park avenues, Cured-in-place pipe lining (also called CIPP lining)
  • SW Market Street between SW 4th Avenue and Naito Parkway, CIPP lining with a small section of horizontal drilling at SW 1st Avenue
  • SW Clay Street between SW 13th and SW Park avenues, CIPP lining
  • SW Clay Street between SW 4th and SW 3rd avenues, CIPP lining
  • SW Columbia Street between SW 10th and SW 6th avenues, CIPP lining
  • SW Columbia Street between SW 5th and SW 3rd avenues, CIPP lining
  • SW Jefferson Street between SW 13th and SW Park avenues, CIPP lining with small segment of pipe reaming from Park Avenue to Broadway
  • SW Jefferson Street between SW 2nd Avenue and Naito Parkway, CIPP lining
  • SW Madison Street at Park Avenue, CIPP lining
  • SW Madison Street between SW Broadway and SW 6th Avenue, CIPP lining
  • SW Madison Street between SW 4th and SW 3rd avenues, CIPP lining
  • SW Madison Street between SW 3rd and SW 2nd avenues, CIPP lining
  • SW Park Avenue between SW Clay and SW Columbia streets, CIPP lining
  • SW 12th Avenue between Market and Clay streets, half CIPP lining and half open cut excavation
  • SW 12th Avenue between SW Columbia and Jefferson streets, horizontal drilling

Go to the SW Market-Madison Sewer Project page.

Carolina Trunk Sewer Project Map (Description)

The image shows a map of the project area. The map shows an area located in S and SW Portland. The map boundaries runs from SW Slavin Road and Barbur Blvd in the north and west to S Macadam Avenue in the east and south. 

The map shows the work types and locations of construction for this project. It shows a new trunk line to be constructed that runs east along SW Slavin Road from just below Barbur Blvd. It turns south near SW Viewpoint Terrace and runs through an easement down to Interstate 5. The new trunk line continues underneath Interstate 5 to S Corbett Avenue. It then runs underground to S Macadam Avenue. 

Work shafts are located at SW Slavin Road near the intersection with SW Viewpoint Terrace, next to Interstate 5, next to Corbett Avenue next to the Corbett offramp for Interstate 5, and on private property next to S Macadam Avenue.

Night work is shown at each shaft area and at the location where the new trunk line will meet S Macadam Avenue. 

The old trunk line running west to east and slightly south of the new trunk line will be abandoned. 

Go to the Carolina Trunk Sewer Project page.

Sandy Boulevard Sewer and Stormwater Project Map (Description)

The map area extends north to I-84, south to E Burnside Street, east to NE 33rd Avenue, and west to NE 12th Avenue. Pipe work is located on:

  • NE Davis Street between NE 12th and 15th Avenues
  • NE 14th Avenue between NE Davis Street and north dead end
  • NE Sandy Boulevard between 15th and 16th Avenues and between NE 25th and NE 31st Avenues
  • NE 16th Avenue between NE Sandy Boulevard and Glisan Street
  • Intersection of NE 17th Avenue and NE Sandy Boulevard
  • Intersection of NE 18th Avenue and NE Sandy Boulevard
  • Intersection of NE 19th Avenue and NE Sandy Boulevard
  • Intersection of NE 20th Avenue and NE Sandy Boulevard
  • NE Glisan Street between NE 16th and NE 21st Avenues
  • NE 21st Avenue between NE Glisan and NE Irving Streets
  • NE Hoyt Street between NE 21st and 23rd Avenues
  • NE Irving Street between NE 21st and 25th Avenues
  • NE 22nd Avenue between NE Irving and Oregon Streets
  • NE Oregon between NE 22nd and 26th Avenues
  • NE 25th Avenue between NE Irving and Oregon Streets
  • NE 27th Avenue between NE Sandy Boulevard and NE Pacific Street

Americans with Disabilities Act (ADA) ramp improvements work is located at the following intersections:

  • NE 14th Avenue and NE Davis Street
  • NE 15th Avenue and NE Davis Street
  • NE 16th Avenue and NE Sandy Boulevard
  • NE 17th Avenue and NE Sandy Boulevard
  • NE 18th Avenue and NE Sandy Boulevard
  • NE 19th Avenue and NE Sandy Boulevard
  • NE 19th Avenue and NE Glisan Street
  • NE 20th Avenue and NE Glisan Street
  • NE 21st Avenue and NE Hoyt Street
  • NE 21st Avenue and NE Irving Street
  • NE 22nd Avenue and NE Hoyt Street
  • NE 22nd Avenue and NE Irving Street
  • NE 22nd Avenue and NE Oregon Street
  • NE 23rd Avenue and NE Hoyt Street
  • NE 23rd Avenue and NE Irving Street
  • NE 23rd Avenue and NE Oregon Street
  • NE 24th Avenue and NE Irving Street
  • NE 24th Avenue and NE Oregon Street
  • NE 25th Avenue and NE Oregon Street
  • NE Lawrence Avenue and NE Sandy Boulevard
  • NE 29th Avenue and NE Sandy Boulevard
  • NE 30th Avenue and NE Holladay Street

Go to the Sandy Boulevard Sewer and Stormwater Project page.

Columbia Slough Outfall 57 Stormwater Project Map (Description)

The map area extends north to the Columbia Slough, south to N Hudson Avenue, east to N Woolsey Avenue, and west to N Fortune Avenue.

Underground Stormwater Facilities work is located at the following intersections:

  • N Fessenden Street and N Geneva Avenue
  • N Fessenden Street and N McKenna Avenue
  • N Fessenden Street and N Berkeley Avenue
  • N Fessenden Street and N Clarendon Avenue
  • N Fessenden Street and N Van Houten Avenue
  • N Fessenden Street and N Exeter Avenue
  • N Fessenden Street and N Portsmouth Avenue
  • N Fessenden Street and N Hodge Avenue
  • N Portsmouth Avenue and N Newark Street
  • N Portsmouth Avenue and N Fessenden Street
  • N Portsmouth Avenue and N Cecelia Street
  • N Columbia Boulevard and N Portsmouth Avenue
  • N Columbia Boulevard and N Columbia Court
  • N Columbia Boulevard and N Fiske Avenue

Green Street Planter work is located on:

  • N Columbia Boulevard between N Columbia Court and N Fiske Avenue

Americans with Disabilities Act (ADA) ramp improvements work is located at the following intersections:

  • N Fessenden Street and N Geneva Avenue
  • N Fessenden Street and N McKenna Avenue
  • N Fessenden Street and N Berkeley Avenue
  • N Fessenden Street and N Clarendon Avenue
  • N Fessenden Street and N Van Houten Avenue
  • N Fessenden Street and N Exeter Avenue
  • N Fessenden Street and N Portsmouth Avenue
  • N Fessenden Street and N Hodge Avenue
  • N Portsmouth Avenue and N Newark Street
  • N Portsmouth Avenue and N Fessenden Street
  • N Columbia Boulevard and N Portsmouth Avenue
  • N Columbia Boulevard and N Fiske Avenue

Go to the Columbia Slough Outfall 57 Stormwater Project page.

Sheridan Trunk Sewer Project – Duniway Park Map (Description)

The map area extends north to the Caruthers Boulevard, south to Sam Jackson Park Road, east to Marquam Nature Park, and west to SW 3rd Avenue.

Sewer trunk pipe and maintenance access work is located:

  • Along SW Sam Jackson Park Road between Marquam Nature Park and SW Terwilliger Boulevard
  • In the norther section of Duniway Park just south SW Terwilliger Boulevard

Lateral connection pipe work and proposed night work is located:

  • Along SW Sam Jackson Park Road between Marquam Nature Park and SW Terwilliger Boulevard

Go to the Sheridan Trunk Sewer Project - Duniway Park Map (description)

Lombard Pump Station and Force Main Upgrade Project Map (Description)

The project area includes work on the pump station off N Columbia Boulevard between Rivergate Boulevard and Lombard Street, and the force main along N Columbia Boulevard and into Chimney and Pier parks. 

  • Starting North at the Lombard Pump Station located off N Columbia Boulevard between Rivergate Boulevard and Lombard Street
  • The force main work runs from the Lombard Pump Station south along N Columbia Boulevard that passes N Lombard Street, through Chimney Park and ends in Pier Park 
  • Seven of the thirteen excavation sites are located between the Lombard Pump Station and N Lombard Street along the force main on N Columbia Boulevard
  • Three of the thirteen excavation sites are between N Lombard Street and Chimney Park on N Columbia Boulevard
  • Two excavation sites are in Chimney Park close to the fence line along N Columbia Boulevard
  • The thirteenth and final excavation site is located at the northern end of Pier Park fairly close to N Columbia Boulevard

Go to the Lombard Pump Station and Force Main Project Page

 

Johnson Creek Oxbow Restoration Project Map (Description)

The image shows a map of the Johnson Creek Oxbow Project. It is bounded by SE Flavel Street in the North, Johnson Creek Boulevard in the South, SE 35th Avenue in the West and SE 55th Avenue in the East.

The map shows the project boundary of the planned restoration project. The planned project will occur along an oxbow in Johnson Creek between SE Cesar Chavez Boulevard in the West and SE 46th avenue in the East. The northern boundary of the project is SE Tenino Street, and the southern boundary is the Springwater Corridor Trail. SE Harney street runs through the center of the project area.

The map also shows The Errol Heights Street Improvement Project to the east of the project area. This is an adjacent street improvement project that was completed by the Portland Bureau of Transportation. It also shows Errol Heights Park and Garden to the east of the project area.

Go to the Johnson Creek Oxbow Project Page.

SW Alder-Harvey Milk Sewer Project Map (Description)

The map area extends from W Burnside Street to the north and SW Salmon Street to the south, and between SW Naito Parkway and SW 18th Avenue.

Pipe work will occur at the following locations, with the sewer construction method listed:

Cured-in-place pipe lining (CIPP):

  • SW Alder Street, between SW 1st and SW 2nd Avenues
  • SW Alder Street, between SW Broadway and SW Park Avenue
  • SW Alder Street, between SW 4th and SW 5th Avenues
  • SW Alder Street, between SW Park and SW 9th Avenues
  • SW Alder Street, between SW 9th and SW 10th Avenues
  • SW Alder Street, between SW 10th and SW 11th Avenues
  • SW Alder Street, between SW 11th and SW 12th Avenues
  • SW Alder Street, between SW 12th and SW 13th Avenues
  • SW Harvey Milk Street, between SW 2nd and SW 4th Avenues
  • SW Harvey Milk Street, between SW Broadway and SW 6th Avenue
  • SW Harvey Milk Street, between SW Broadway and SW Park Avenue
  • SW Harvey Milk Street, between SW Park and SW 9th Avenues
  • SW Harvey Milk Street, between SW 9th and SW 12th Avenues
  • SW Park Avenue, between SW Alder and SW Morrison Streets
  • SW Taylor Street, between SW Broadway and SW 6th Avenue
  • SW Washington Street, between SW 2nd and SW 4th Avenues
  • SW Washington Street, between SW Broadway and SW 6th Avenue
  • SW Washington Street, between SW Broadway and SW Park Avenue
  • SW Washington Street, between SW Park and SW 10th Avenues
  • SW Washington Street, between SW Park and SW 9th Avenues
  • SW Washington Street, between SW 9th and SW 10th Avenues
  • SW Washington Street, between SW 10th and SW 11th Avenues
  • SW Washington Street, between SW 11th and SW 12th Avenues
  • SW Washington Street, between SW 13th and SW 14th Avenues

Horizontal directional drilling (HDD):

  • SW 2nd Avenue, between SW Washington and SW Harvey Milk Streets
  • SW 6th Avenue, between SW Alder and SW Washington Streets
  • SW Broadway, between SW Alder and SW Morrison Streets
  • SW 10th Avenue, between SW Alder and SW Harvey Milk Streets
  • SW 11th Avenue, between SW Alder and SW Washington Streets
  • SW 12th Avenue at SW Harvey Milk Street

Open cut excavation:

  • SW Alder Street, between SW 5th and SW 6th Avenues
  • SW 17th Avenue and W Burnside Street

Maintenance access:

Work crews will access maintenance holes at the following locations, to repair or replace sewer pipes:

  • SW Alder Street and SW 1st Avenue
  • SW Alder Street and SW 2nd Avenue
  • SW Alder Street and SW 3rd Avenue
  • SW Alder Street and SW 4th Avenue
  • SW Alder Street and SW 5th Avenue
  • SW Alder Street and SW 6th Avenue
  • SW Alder Street and SW Broadway
  • SW Alder Street and SW Park Avenue
  • SW Alder Street and SW 9th Avenue
  • SW Alder Street and SW 10th Avenue
  • SW Alder Street and SW 11th Avenue
  • SW Alder Street and SW 12th Avenue
  • SW Alder Street and SW 13th Avenue
  • SW Harvey Milk Street and SW 2nd Avenue
  • SW Harvey Milk Street and SW 3rd Avenue
  • SW Harvey Milk Street and SW 4th Avenue
  • SW Harvey Milk Street and SW 6th Avenue
  • SW Harvey Milk Street and SW Broadway
  • SW Harvey Milk Street and SW Park Avenue
  • SW Harvey Milk Street and SW 9th Avenue
  • SW Harvey Milk Street and SW 10th Avenue
  • SW Harvey Milk Street and SW 11th Avenue
  • SW Harvey Milk Street and SW 12th Avenue
  • SW Morrison Street and SW Broadway
  • SW Morrison Street and SW Park Avenue
  • SW Taylor Street and SW 6th Avenue
  • SW Taylor Street and SW Broadway
  • SW Washington Street and SW 1st Avenue
  • SW Washington Street and SW 4th Avenue
  • SW Washington Street and SW 6th Avenue
  • SW Washington Street, between SW Broadway and SW Park Avenue
  • SW Washington Street and SW 10th Avenue
  • SW Washington Street and SW 11th Avenue
  • SW Washington Street and SW 12th Avenue
  • SW Washington Street and SW 13th Avenue
  • SW Washington Street and SW 14th Avenue

Go to the SW Alder-Harvey Milk Sewer Project page.

SE 36th Place Sewer Extension Project Map (Description)

The project site is located on SE 36th Place between SE Raymond and SE Schiller Streets. Pipe work will occur on SE 36th Place starting at SE Raymond Street and runs north about halfway up the block.

Go to the SE 36th Place Sewer Extension Project page.

NE 33rd Drive Pump Station Upgrades Project Map (Description)

The project site is located at 7548 NE 33rd Drive, north of NE Columbia Boulevard and near Columbia Slough.

Go to the NE 33rd Drive Pump Station Upgrades Project page.

Springwater Wetland Enhancement Project Map (Description)

The project site spans from SE 111th to SE 122nd Avenues and crosscuts through the Springwater Corridor Trail and Beggars Tick. Project boundaries run as far north to SE Harold Street and extend southeast beyond Zenger Farms.

Proposed bike/pedestrian access:

Work crews-built bike/pedestrian access at the following locations:

  • SE 115th to SE 117th Avenues, near SE Ramona Court and north of Springwater Corridor Trail

Maintenance access:   

Work crews accessed maintenance gates at the following locations, to conduct restoration work:

  • SE 111th Avenue and SE Harold Street
  • SE 113th Avenue and SE Reedway Street
  • SE 113th Avenue and SE Ramona Court

Go to the Springwater Wetland Enhancement Project page.

West Lents Floodplain Restoration Project Map (Description)

The project site spans from SE 82nd Avenue towards SE 92nd Avenue. Project boundaries run south of the Springwater Corridor Trail and extend west of SE 82nd Avenue and SE Harney Street.

Construction access:

Work crews accessed maintenance gates at the following locations, to conduct restoration work:

  • SE 82nd Avenue, north of SE Harney Street
  • SE 85th Avenue at SE Lambert Street
  • SE 89th Avenue at SE Crystal Springs Boulevard

Streets to be removed:

Work crews removed the following streets, to conduct restoration work:

  • SE Lambert Street, between SE 85th and SE 89th Avenues
  • SE Malden Street, south of SE 87th Avenue and SE Malden Court

Go to the West Lents Floodplain Restoration Project page.

Brookside Wetland Restoration Project Map (Description)

The project site covers 13 acres of wetland and is located along SE Foster Road, near the intersection of SE 110th Avenue and SE Brookside Drive.

Go to the Brookside Wetland Restoration Project page.

Kenton Outfalls Stormwater Improvement Project Map (Description)

The image is a map showing the project area located on the North Portland Peninsula west of Interstate 5.

The map shows a highlighted focus area centered on North Columbia Boulevard. This highlighted focus area represents areas where stormwater flows into pipes that discharge to the Columbia Slough. It also shows the locations of four outfalls where this occurs. These outfalls are located on the south side of the Columbia Slough at the approximate locations of North Endicott Street, North Tyndall Street, North Fenwick Street, and North Mississippi Street. It also shows an outline of a project area near North Columbia Boulevard where new stormwater management infrastructure will be constructed.

Further to the south and east of this focus area, the map also shows an area where Environmental Services will work with property owners to install private rain gardens via the Private Property Retrofit Program. This area is between North Lombard in the north, N Willamette Boulevard in the south, N Curtis Avenue in the east, and N Fisk Avenue in the west.

It also shows four areas where potential green street facilities may be constructed in the public right-of-way.

  • Between North Willamette Blvd and N Amherst Street, N Portsmouth Avenue and N Haven Avenue.
  • Between N Vanderbilt Street and N Houghton Street, N Vanhouten Avenue and North Hereford Avenue.
  • Between N Lombard Avenue and N Drew Street, North Newman Avenue and North Hodge Avenue.
  • N Willis Boulevard and N Kilpatrick Street, North Chautaqua Boulevard and N Woolsey Avenue.

 Go to the Kenton Outfalls Improvement Project Webpage

Kenton Outfalls Stormwater Improvement Project - Columbia Boulevard Work Zone (Description)

The image is a map showing the Kenton Outfalls Stormwater Improvement Project focus area located near Columbia Boulevard in North Portland.

The map shows a highlighted focus area centered on North Columbia Boulevard. This highlighted focus area represents areas where stormwater flows into pipes that discharge to the Columbia Slough. It also shows the locations of four outfalls where this occurs. These outfalls are located on the south side of the Columbia Slough at the approximate locations of North Endicott Street, North Tyndall Street, North Fenwick Street, and North Mississippi Street. 

The maps shows the following stormwater facilities to be constructed:

  • A section of impervious pavement located on N Columbia Boulevard between N Denver Avenue and Interstate 5.
  • Three green street planters located along Columbia Boulevard just west of Interstate 5.
  • One green street planter located near the Intersection of N Argyle Street and N Columbia Boulevard.
  • A stormwater sump located near N Columbia Boulevard and N Curtis Avenue.
  • A stormwater sump located near N Columbia Boulevard and N Burrage Avenue.
  • A stormwater sump located near N Columbia Boulevard and N Wilbur Avenue.
  • A stormwater sump located near N Columbia Boulevard and N Delaware Avenue.
  • A stormwater sump located near N Columbia Boulevard and N Fenwick Avenue.
  • Two stormwater filter vaults located on N Columbia Boulevard adjacent to Interstate 5.
  • Two stormwater filter vaults located near N Columbia Boulevard and N Delaware Avenue.
  • A stormwater filter vault located near N Columbia Boulevard and N Curtis Avenue.
  • A stormwater filter vault located near N Columbia Boulevard and N Bayard Avenue.
  • A stormwater filter vault located near N Columbia Boulevard and N Endicott Avenue.

Go to the Kenton Outfalls Improvement Project Webpage

Kenton Outfalls Stormwater Improvement Project - North Portland "Swap" Area (Description)

The image is a zoomed in map showing the Kenton Outfalls Stormwater Improvement Project "swap" area in North Portland. It shows an area where Environmental Services will work with property owners to install private rain gardens via the Private Property Retrofit Program. This area is between North Lombard in the north, N Willamette Boulevard in the south, N Curtis Avenue in the east, and N Fisk Avenue in the west.

It also shows four areas where potential green street facilities may be constructed in the public right-of-way.

  • Between North Willamette Blvd and N Amherst Street, N Portsmouth Avenue and N Haven Avenue.
  • Between N Vanderbilt Street and N Houghton Street, N Vanhouten Avenue and North Hereford Avenue.
  • Between N Lombard Avenue and N Drew Street, North Newman Avenue and North Hodge Avenue.
  • N Willis Boulevard and N Kilpatrick Street, North Chautaqua Boulevard and N Woolsey Avenue.

Go to the Kenton Outfalls Improvement Project Webpage

Council Crest Sewer and Stormwater Project Map (Description)

The image is a map showing the project area located SW Portland. The map boundaries are approximately Southwest Dosch Road in the west, Southwest Agate in the north, Southwest Fairmount Boulevard in the east, and SW Sunset Boulevard in the south.

The map shows the location of planned work:

  • A detention basin at the intersection of Southwest Dosch Road and Southwest Sunset Boulevard
  • A detention basin at the intersection of Southwest Hamilton Court and Southwest 27th Avenue

Go to the Council Crest Sewer and Stormwater Project Page

South Macadam Drainage Improvement Project Map (Description)

The image is a map showing the project area located S Portland. The map boundaries are approximately Interstate 5 in the west, S Mitchell in the north, The Willamette River to the east, and S Nebraska street in the south.

The map shows the locations of planned work:

  • Intersection of S Kelly Avenue and S Sweeney Street
  • Intersection of S Corbett Avenue and S Flower Street
  • Intersection of S Hood Avenue and S Flower Street
  • Intersection of S Hood Avenue and S Pendleton Street
  • Intersection of S Macadam Avenue and S Pendleton Street
  • Intersection of S Virginia Avenue and S Iowa Street
  • Intersection of S Hood Avenue and S Carolina Street
  • Intersection of S Virginia Avenue and S Carolina Street
  • Intersection of S Macadam Avenue and S Carolina Street
  • Intersection of S Virginia Avenue and S Dakota Street
  • Intersection of S Macadam Avenue and S Dakota Street

Go to the S Macadam Drainage Improvement Project Page

N Going and Greeley Sewer Project Map (Description)

The image is a map showing the project area located in North Portland. The map boundaries are approximately N Alberta Street and the Adidas Campus to the north, Madrona Park and N Greeley Avenue to the west, N Going Street to the south, and N Concord Avenue to the east.

The map shows that Phase One is complete which took place on N Delaware Street, N Alberta Street, and the southeast corner of the Adidas Campus.

Phase Two work shows the locations of planned work in Phase Two:

  • Pipe to be abandoned from N Greeley Avenue, through Madrona Park, south to N Going Street
  • Trenchless pipe work from Madrona Park on the east side of N Greeley Avenue and N Humboldt Street mid-way towards N Gay Avenue
  • Trenchless pipe work in N Going Street from just west of N Greeley Avenue, east along Going Street to before N Concord Avenue
  • A portion of trenchless pipe work crossing N Going Street from N Going Court
  • Open trench construction along N Greeley Avenue from the Adidas Campus, south to N Going Street, then east along southern edge of N Going Court

Go to the N Going and Greeley Sewer Project Page

Tanner Trunk Sewer Project Map (Description)

  • SW Market St (west to east corridor)
    • Continuous pipe work running along SW Market St from near SW 20th Ave eastward past SW 19th Ave and toward SW 17th Ave.
  • SW Market St Dr (northwest diagonal segment)
    • Pipe work along the diagonal stretch connecting SW Market St Dr to SW 19th Ave.
  • SW 19th Ave (north–south segment)
    • Pipe work extends north from SW Market St Dr up SW 19th Ave (short segment).
  • SW 18th Ave (north–south segment)
    • Pipe work runs along SW 18th Ave between SW Market St and SW Clay St.
  • SW 17th Ave (primary north–south corridor)
    • Continuous pipe work from SW Market St north through:
      • SW Clay St intersection
      • SW Columbia St intersection
      • Up toward SW Madison St
  • SW Clay St (east–west segment)
    • Pipe work crosses SW Clay St at SW 17th Ave and extends slightly east and west of the intersection.
  • Intersection: SW 17th Ave & SW Market St
    • Major junction with pipe work in multiple directions (north, south, east, west).

      Proposed Night Work Location (red dashed oval)

  • Centered on SW 17th Ave between SW Columbia St and SW Madison St
  • Includes:
    • The SW 17th Ave & SW Columbia St intersection
    • The block of SW 17th Ave immediately north of SW Columbia St
    • Extends toward SW Madison St

Go to the Tanner Trunk Sewer Project Webpage.

N Commercial Sewer Project Map (Description)

The image is a map showing the project area located in North Portland. The work is concentrated along a north–south corridor on N Commercial Ave with a few east–west connections. Here's where each segment appears:

  • Main vertical stretch (N Commercial Ave):
    Runs from just south of Sumner / NE Alberta St, down past N Blandena St, N Prescott St, and N Skidmore St, continuing toward N Mason St and ending near Unthank Park.
  • Northern connection:
    At the top, the pipe runs west from N Commercial Ave to Jefferson High School, roughly between Webster St and NE Alberta St.
  • Mid-north connection:
    A short horizontal segment along N Blandena St, extending east from N Commercial Ave.
  • Central connection:
    Another horizontal segment along N Skidmore St, crossing N Commercial Ave.
  • Southern connection:
    A short horizontal section near N Mason St, just west of N Commercial Ave.

In short, most of the work is centered on N Commercial Ave, with several short branches extending west or east at key cross streets (Blandena, Skidmore, and near Mason), plus a longer northern branch reaching toward Jefferson High School.

Go to the N Commercial Sewer Project Webpage.

West Portland Town Center Planning Area Map (Description)

Overall location

  • The project area sits in west/southwest Portland, covering parts of West Portland Park, Crestwood, Ashcreek, and areas near Markham.
  • It generally follows the 99W corridor (SW Barbur Blvd / SW Capitol Hwy) from north to south.

Northern boundary

  • Reaches up to around SW Multnomah Blvd and SW Garden Home Rd.
  • Includes areas near Tryon Creek Headwaters and Spring Garden Park.
  • Western edge in the north includes the Woods Memorial Natural Area.

Eastern boundary

  • Runs roughly along SW 35th Ave.
  • Stays just west of Marshall Park and east of West Portland Park.

Southern boundary

  • Extends down toward SW Arnold St, SW Pomona St, and near Loll Wildwood Natural Area.
  • Includes parts of Crestwood Park and areas close to Sylvania / Far Southwest.

Western boundary

  • Generally follows around SW 45th–50th Ave in sections.
  • Includes Holly Farm Park and portions of the Woods Memorial Natural Area.
  • Stays east of the I-5 corridor for most of its length but approaches it in the south.

Go to the West Portland Town Center Planning Webpage.

Inverness Pump Station and Force Main Improvement Program (Description)

This map shows a broad area of North and Northeast Portland, from N Portland Road in the west to NE 112nd in the east. It's northern boundary is the Columbia River. It's southern boundary is approximately N/NE Killingsworth Street.

The map depicts the Inverness Pump Station and Force Main system. 

  • On the eastern end, the map shows the Inverness Pump Station. On the western end, the map shows the Columbia Boulevard Wastewater Treatment Plant. 
  • The map shows the path of the force mains that connect the pump station and treatment plant. The path runs along the Columbia River, under I-205 and I-5, before travelling under the Heron Lakes Golf Course and connecting to the plant. 
  • An inset map shows an outfall pipe that runs from the pump station out to the Columbia River near Marine Drive. 
  • It also shows an area of planned repair for the outfall pipe between NE Glen Widing Drive and NE Marine Drive, as well as an outfall at the end of the pipe into the Columbia River.

Go to the Inverness Pump Station and Force Main Improvement Program.

Inverness Pump Station Force Main Rehabilitation Project (Description)

This map shows a broad area of North and Northeast Portland, from N Portland Road in the west to NE 112nd in the east. It's northern boundary is the Columbia River. It's southern boundary is approximately N/NE Killingsworth Street.

The map depicts the Inverness Pump Station and Force Main system. 

  • On the eastern end, the map shows the Inverness Pump Station. On the western end, the map shows the Columbia Boulevard Wastewater Treatment Plant. 
  • The map shows the path of the force mains that connect the pump station and treatment plant. The path runs along the Columbia River, under I-205 and I-5, before travelling under the Heron Lakes Golf Course and connecting to the plant. 
  • An inset map shows an outfall pipe that runs from the pump station out to the Columbia River near Marine Drive. 
  • It also shows an area of planned repair for the outfall pipe between NE Glen Widing Drive and NE Marine Drive, as well as an outfall at the end of the pipe into the Columbia River.

Go to the Inverness Pump Station Force Main Rehabilitation Project Webpage.

Buckman-Kerns ADA Ramps (Description)

This map shows a broad area of the Buckman and Kerns neighborhoods, from NE Glisan Street to the north, SE Hawthorne Boulevard to the south, and SE and NE 11th avenues to the west, and SE and NE 35th avenues to the east.

The map depicts the intersections where American with Disabilities Act (ADA) curb ramp locations will be installed:

  • NE Couch Street at NE 28th, 29th, 30th, and 31st avenues
  • SE Ankeny Street at SE 22nd, 27th, and 30th avenues
  • SE Ash Street at SE 22nd and 27th avenues
  • SE Pine Street and SE 26th Avenue
  • SE Stark Street at SE 16th, 17th, and 18th avenues
  • SE Washington Street at SE 16th and 18th avenues
  • SE Alder Street at SE 16th, 18th, and 19th avenues
  • SE Morrison Street and SE 16th Avenue
  • SE Belmont Street at SE 15th, 16th, and 18th avenues
  • SE Yamhill Street at SE 21st and 23rd avenues
  • SE Taylor Street at SE 17th, 20th, 22nd, and 26th avenues
  • SE Salmon Street at SE 14th, 16th, 17th, 18th, 19th, 20th, 21st, 22nd, 26th, 28th, 29th, 30th, 31st, 32nd Ave (including alley), 32nd Pl, 33rd, and 34th avenues (construction started with these intersections)
  • SE Main Street at SE 15th, 18th, 20th, 24th, and 29th avenues
  • SE Madison Street at SE 16th, 19th, 22nd, 23rd, 24th, 25th, 26th, and 27th avenues

Go to the Buckman-Kerns ADA Ramp Project Webpage

SW Oak-Burnside Sewer Repair Project Map (Description) 

The map area extends from W Burnside Street to the north and SW Harvey Milk Street to the south, and between SW Oak Street and SW 13th Avenue.

Pipe work will occur at the following locations, with the sewer construction method listed:

Cured-in-place pipe lining (CIPP):

  • SW 1st Avenue at W Burnside Street
  • W Burnside Street between SW 1st Avenue and SW 3rd Avenue
  • W Burnside Street between NW 3rd Avenue and NW 4th Avenue
  • NW 3rd Avenue at W Burnside Street
  • SW 5th Avenue between W Burnside Street and SW Ankeny Street
  • NW 6th Avenue at W Burnside Street
  • W Burnside Street between NW Broadway and NW 8th Avenue
  • W Burnside Street between NW 8th Avenue and NW 9th Avenue
  • W Burnside Street between SW Park Avenue and SW 9th Avenue
  • W Burnside Street between SW 9th Avenue and SW 11th Avenue
  • W Burnside Street between SW 11th Avenue and SW 13th Avenue
  • SW 9th Avenue between W Burnside Street and SW Harvey Milk Street
  • SW 10th Avenue between W Burnside Street and SW Harvey Milk Street
  • SW Ankeny Street between SW 1street Avenue and SW 3rd Avenue
  • SW Naito Parkway between SW Ankeny Street and SW Ash Street
  • SW Ash Street between SW Naito Parkway and SW 1st Avenue
  • SW Ash Street between SW 1st Avenue and SW 2nd Avenue
  • SW Ash Street between SW 2nd Avenue and SW 3rd Avenue
  • SW Ash Street between SW 3rd Avenue and SW 4th Avenue
  • SW Pine Street between SW Naito Parkway and SW 1st Avenue
  • SW Pine Street between SW 1st Avenue and SW 3rd Avenue
  • SW 2nd Avenue between SW Ash Street and SW Pine Street
  • SW Pine Street between SW Naito Parkway and SW 1st Avenue
  • SW Pine Street between SW 1st Avenue and SW 3rd Avenue
  • SW 1st Avenue between SW Pine Street and SW Oak Street
  • SW 2nd Avenue between SW Pine Street and SW Oak Street
  • SW Pine Street between SW 3rd Avenue and SW 4th Avenue
  • SW Pine Street between SW 4th Avenue and SW 5th Avenue
  • SW Pine Street between SW 3rd Avenue and SW 4th Avenue
  • SW Pine Street between SW 6th Avenue and SW 8th Avenue
  • SW Oak Street at SW Naito Parkway
  • SW Oak Street between SW 1st Avenue and SW 2nd Avenue
  • SW Oak Street between SW 2nd Avenue and SW 3rd Avenue
  • SW 3rd Avenue at SW Oak Street
  • SW Oak Street between SW 2nd Avenue and SW 3rd Avenue
  • SW Oak Street between SW 3rd Avenue and SW 4th Avenue
  • SW Oak Street between SW 6th Avenue and SW Park Avenue
  • SW Oak Street between SW 6th Avenue and SW Broadway
  • SW Broadway and SW Park Avenue

Open cut excavation:

  • NW 3rd Avenue at W Burnside Street
  • W Burnside Street between NW 8th Avenue and NW 9th Avenue
  • W Burnside Street between SW Park Avenue and SW 9th Avenue
  • W Burnside Street between SW 9th Avenue and SW 11th Avenue
  • SW 9th Avenue between W Burnside Street and SW Harvey Milk Street
  • SW Ash Street between SW Naito Parkway and SW 1st Avenue
  • SW Ash Street between SW 1st Avenue and SW 2nd Avenue
  • SW Ash Street between SW 2nd Avenue and SW 3rd Avenue
  • SW 1st Avenue between SW Pine Street and SW Oak Street
  • SW Pine Street between SW 6th Avenue and SW 8th Avenue
  • SW Oak Street between SW 6th Avenue and SW Park Avenue
  • SW Yamhill Street between SW 2nd Avenue and SW 4th Avenue

New maintenance access:

Work crews will build new access maintenance holes at the following locations, to repair or replace sewer pipes:

  • NW 3rd Avenue at W Burnside Street
  • SW Pine Street between SW Naito Parkway and SW 1st Avenue
  • SW Pine Street between SW 1st Avenue and SW 3rd Avenue
  • SW 1st Avenue between SW Pine Street and SW Oak Street
  • SW Oak Street between SW 1street Avenue and SW 2nd Avenue
  • SW Oak Street between SW 6th Avenue and SW Park Avenue
  • SW Broadway and SW Park Avenue

Go to the SW Oak-Burnside Sewer Repair Project page.


 

Other

Quarterly rate changeover bill example for Summer 2026 Customer Newsletter

Example bill lists services: water volume (old rate) 20 CCF / 90x18 @ $8.171; water volume (new rate) 20 CCF / 90x72 @ $8.833; sewer volume (old rate) 15 CCF / 90x18 @ $13.54; sewer volume (new rate) 15 CCF / 90x72 @ $14.24. The number 1 appears next to 20 CCF. The number 2 appears above 90. The number 3 appears next to 18. The number 4 appears next to 72.

Back to top