Environmental Services completed construction on a project to repair and build sediment/sump systems near NE Glisan Street at NE 91st and 92nd avenues, and on SE 94th Avenue north of SE Stark Street to help prevent sewer and stormwater overflows to homes, businesses, and streets.
Construction is complete.

Project Area

This project has three locations that has constructed or repaired sediment/sump systems. NE Glisan Street in the intersection of NE 91st Avenue and just to the east, NE Glisan Street in the intersection of NE 92nd Avenue and just to the west, and SE 94th Avenue just north of SE Stark Street.

Three locations for constructing or repairing sediment/sump systems. One is NE 91st and Glisan, two is NE 92nd and Glisan, and three is SE 94th Avenue, north of SE Stark Street.

Construction is complete

Thank you for your patience during construction.

What are Sumps and Sedimentation Maintenance Holes?

A sump maintenance hole (sump) is a large, concrete cylinder installed under a street that temporarily holds stormwater while slowly releasing it into the ground. The sump is connected to a storm drain and a separate tank, called a sedimentation maintenance hole, that filters out garbage and pollutants. 

For more information about sump maintenance holes and other ways in which BES manages stormwater, visit portland.gov/bes/manage-stormwater.

Illustration that shows a car parked on the street, with a raincloud overhead. Under the street shows a storm drain with a pipe into a sedimentation manhole, connected to a sump or underground injection control (UIC).

This project will help protect the health of the Willamette River Watershed.


 