Information
Contractors working on construction projects for the Bureau of Environmental Services are required to post the following signage at the construction site as described in their contract documents.
Contractors should work with a sign vendor of their choice to download the PDF files and produce the necessary construction site signage. Discuss installation with your sign vendor before having the signs manufactured. Sign vendors may be able to drill holes in the signs at the locations needed for installation. All sign production and installation costs are the responsibility of the contractor.
Stormwater Construction
Artwork
Artwork file is production ready. Sign specifications below.
- Size: 32x48 inches
- File: PDF. Vector art (scalable for larger signs). Text converted to outlines.
- Printing: White sign with dark blue text and waves. PMS 287 or 288 preferred. 4-sided full-bleed. UV ink for outdoor applications.
Materials
- Corrugated plastic — Acceptable only on project of 4-month duration.
- Dibond, alupanel, or similar composite panel; aluminum; or wood — Acceptable materials for projects with duration longer than 5 months.
Sewer Construction
Artwork
Artwork file is production ready. Sign specifications below.
- Size: 32x48 inches
- File: PDF. Vector art (scalable for larger signs). Text converted to outlines.
- Printing: White sign with dark blue text and waves. PMS 287 or 288 preferred. 4-sided full-bleed. UV ink for outdoor applications.
Materials
- Corrugated plastic — Acceptable only on project of 4-month duration.
- Dibond, alupanel, or similar composite panel; aluminum; or wood — Acceptable materials for projects with duration longer than 5 months.
Erosion Control
Artwork
Artwork file is production ready. Sign specifications below.
- Size: 24x30 inches
- File: PDF. Vector art (scalable for larger signs), text converted to outline
- Printing: White sign with dark green text and waves. PMS 357 preferred. 4-sided full-bleed. UV ink for outdoor applications.
- PROVIDE YOUR SIGN VENDOR WITH THE CORRECT BES PROJECT NUMBER
Materials
- Corrugated plastic—Acceptable only on projects of 4-month duration.
- Dibond, Alupanel, or similar composite panel; aluminum; or wood — Acceptable materials for projects with duration longer than 5 months.
Contact the project's community outreach contact with questions.