danger
COVID-19 Risk Level for Multnomah County: Extreme Risk

New Single Family Residence (NSFR) Permits- Residential

Service
Apply for a building permit for a new home build in Portland. Get a permit application and all required forms for building a new home. Find information on new house permits and new home inspections. Before you build, learn what you need for a complete application for new construction here.
On this Page

Who can do the work 

Contractors must have a license to work in Oregon. The Oregon Construction Contractors Board (CCB) issues licenses to contractors. The permit application and their company materials must list the license number. Need help finding a contractor? The CCB website has good tips on how to search for one.  Plumbing and Electrical contractors have additional license requirements.  

If you are a homeowner doing the work yourself, then you can sign the trade permit applications. You can only do the electrical work if you own and occupy the home and are not planning on selling or renting within 6 months. The State of Oregon has some helpful information for homeowners: 

NSFR application form and important forms and information 

The following information is part of the application. This is everything you might need when applying for a new single family residence permit. Since every project is unique, there may be some situations where you will be asked to provide additional information. Read more about what to include in your application and how to apply for permit

Things you need to apply for this permit may include some or all of the following:

Additional applications for combination permits (if applicable)

Step 1: Research your property and what you need for new home construction 

Code and rules

Permits are reviewed under multiple city and state codes including: 

Other codes may apply based on the scope of work. The City and State Codes, Administrative Rules, Code Guides and Program Guides web page has the codes, administrative rules, code guides and program guides.

Combination permits

Development Services sells a "Residential Combination" permit package. This allows you to call for all inspections using one Building Permit (RS) IVR number. You can also pay for all the permits at one time. If you choose a combination permit, you will need to submit the trade (mechanical, electrical, and/or plumbing) applications with your plans. If you are hiring subcontractors to do the trade work, they must sign their trade permit application.  

Excavation guidelines for a new home build

Be careful when digging near the property line for construction. The work should not cause damage to the next door property and buildings. The Temporary Excavation Guidelines has information on requirements.

Planning and Zoning

Before getting started, contact Planning and Zoning to find out what is allowed on your property. There are rules about maximum building coverage and required setbacks that could impact your project.

Step 1b: Still need help? Schedule a 15-minute appointment 

If you have questions after reviewing the information on this page, we recommend you book a free 15-minute appointment with us. 

This is an optional step. We're here for you if you have questions about the information and materials you need to apply. 

If you need help, here are some experts we recommend you meet with for this project*: 

Meet with a Permit Technician 

  • Schedule this appointment if you have questions about the permit process. Permit technicians will provide you with the information found on this page. 
  • Get help with permit application requirements. 

These are optional meetings. Only book if you have questions. 

Meet with a Permit Technician

Meet with a City Planner 

  • We recommend you meet with city planner about planning and zoning or tree code requirements before submitting building permits.  
  • Get information on rules that apply to your property. 

These are optional meetings. Only book if you have questions.

Meet with a City Planner

Meet with a Building Code and Engineering Reviewer

  • Get help with building code and engineering requirements. 
  • To submit a question by phone, call Building Code Plan Review.  

These are optional meetings. Only book if you have questions. 

Meet with a Building Code and Engineering Reviewer

Meet with a Water expert 

  • Find out if your project requires you to increase the size of your existing water meter. 
  • For development and construction related questions about water services. 

These are optional meetings. Only book if you have questions. 

Meet with a Water expert

Meet with a Transportation expert 

  • Questions about how your project will affect the right-of-way.  
  • Find out if your project will trigger right-of-way improvements. 

These are optional meetings. Only book if you have questions. 

Meet with a Transportation expert

Get help from the Bureau of Environmental Services (BES) 

  • Questions about the sewer, waste line, or stormwater. 

These are optional meetings. Only book if you have questions. 

Get help from BES

*Not all review groups may be listed. The groups listed above will help get you started. 

Step 2: Apply for a new home construction permit

Overview of NSFR intake processes

New Single Family Residential (NSFR) projects have two different intake processes:

  • NSFR Submittal and Review Process for one or two-dwelling unit projects can be submitted as a single application 

  • Three or more dwelling units (designed to the residential code) on a single lot or attached to each other are batched together 

New home submittal and review process for projects with one or two units

You can submit your permit application request online using Development Hub PDXRead step-by-step instructions for submitting a permit application request online or in person. 

For most projects, electronic plans are submitted through the Single PDF process. Large projects such as commercial new construction are submitted though PDX E-plans and ProjectDox.

If you are unable to create electronic plans, please call us and we will work with you.

Submit the following completed materials:

  • Four sets of complete plans
  • NSFR application 
  • NSFR minimum submittal checklist and sample site plan (often called a plot plan)
  • NSFR Life Safety and Structural Review completeness checklist
  • Any additional submittal materials 
  • Intake fees

A Development Services technician will contact you to discuss your application and next steps. Incomplete applications and plans will be returned to you. The complexity of the plans will determine how quickly they are reviewed and approved.

After you talk with a Development Services technician, you can check your permit status online. You can find the permit status and the assigned reviewer information on Portland Maps

If you are unable to create electronic plans yourself, please call us and we will work with you.

New construction batch submittal and review process for projects with three or more units 

You can submit your permit application request online using Development Hub PDXRead step-by-step instructions for submitting a permit application request online or in person. 

For most projects, electronic plans are submitted through the Single PDF process. Large projects such as commercial new construction are submitted though PDX E-plans and ProjectDox.

If you are unable to create electronic plans, please call us and we will work with you.

These projects have their own application process:

  • three or more units 
  • built to the Oregon Residential Specialty Code or International Residential Code
  • located on a single tax lot or attached to each other
  • Examples include: three townhouse units on one tax lot, three townhouses on separate tax lots or a group of three single-family homes on one tax lot. 

These projects have unique Planning and Zoning requirements. Projects with more than one structure on one tax lot also need a separate Site Development permit. This is for common infrastructure elements such as driveways, utilities, and landscaping.

Submit the following completed materials by email to Permitting General Information:

  • Completed Batch Intake Worksheet (including information for each building type)
  • Four sets of complete plans
  • Completed Life Safety Completeness Checklist for NSFRs
  • Any additional submittal materials

A Process Manager will be assigned to your project. The Process Manager will contact you to discuss your application and next steps. Please contact Permitting General Information for more information or to discuss the NSFR projects.

Step 3: Check plan review status and make corrections to an application 

You can check the status of a permit review on Portland Maps permit/case search. Many people might review a single permit. The Permit Review Process web page has more information about the groups who review permits. 

A checksheet is sent to the applicant when a reviewer needs additional information or a correction has to be made to the plans. Read more about how to send us corrections and how to prepare corrected paper plans.

Step 4: Get your new house construction permit

You will be contacted when your permit is ready, and notified of your final fee total. Instructions will be given on how to get your approved permit and pay your fees. Your permit is not issued until all fees are paid. Read more about the pre-issuance process.

Step 5: Start building and get ready for new home inspections

The inspection card lists all the inspections you will likely need during your construction project, and what work needs to be done first.  

Once your building permit is issued, erosion control measures and sometimes tree protection measures must be installed, inspected and approved prior to beginning any further ground-disturbing activities.

All permits need a final approval inspection to be complete.

Step 6: Schedule an inspection, get inspection results and make corrections

To schedule an inspection, call the automated inspection request line. You will need your IVR or permit number and the three digit code for the inspection.

Get the results of the inspection on Portland Maps permit/case search the next day.

Read more about why work does not get approved and how to schedule a reinspection.

Contact residential inspectors about your permit inspections

If you have questions before or after your inspection, you can talk to an inspector.

Contact

Building Code Plan Review

Development Services

phone number503-823-1456

Monday through Friday from 8 am - 5 pm. Leave a message with detailed information.

Permitting General Information

Development Services

Requests for Inspection

Development Services

phone number503-823-7000

Automated Line - Requires an IVR or permit number

Residential Inspections

Development Services

phone number503-823-7388

Monday through Friday from 8:15 am - 3:45 pm. Leave a detailed message.

fax number503-823-7693

Location